Perencanaan Dan Desain Saluran Transmisi Kayan Hydropower ke Grid Kalimantan

Hati, Redi Permata (2019) Perencanaan Dan Desain Saluran Transmisi Kayan Hydropower ke Grid Kalimantan. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111745000019_Undergraduate_Theses.pdf]
Preview
Text
07111745000019_Undergraduate_Theses.pdf

Download (4MB) | Preview

Abstract

Energi listrik sangat penting peranannya dalam kehidupan manusia. Pertumbuhan penduduk yang sangat pesat diiringi dengan konsumsi energi listrik yang meningkat. Oleh karena itu perlu langkah semaksimal mungkin untuk memenuhi hal tersebut. Salah satu langkah yang dilakukan yaitu merencanakan saluran transmisi dari pembangkit agar energi listrik dapat tersalurkan secara maksimal. Pada penelitian ini dibahas tentang perencanaan saluran transmisi udara tegangan tinggi dari Kayan Hydropower menuju Grid Kalimantan (Long Apari) 900 MW dengan panjang saluran 110 kms mulai dari pemilihan rute saluran hingga desain saluran transmisi. Dari penelitian ini diperoleh dasar peralatan penyaluran melalui jaringan udara transmisi. Saluran udara transmisi tersebut menggunakan tegangan 150 kV terdiri dari 509 menara transmisi dengan jarak antar menara rata - rata 300 m. Konduktor yang digunakan adalah konduktor ACSR 45/7 650 mm2 diameter 3,44 cm ( r=1,702 cm ) 2 bundle konduktor dengan susunan 45AL / 7St , andongan yang dihasilkan 1,25 m untuk keadaan menara dengan ketinggian sama. Sedangkan total losess sepanjang saluran sebesar 1369,5 kW. Perencanaan saluran transmisi ini dimodelkan dalam bentuk desain visual menggunakan software PLS Cadd.
===============================================================================================================================
Electrical energy is very important in human life. Very rapid growth is accompanied by increased electricity consumption. therefore it is necessary to take the maximum steps to fulfill this. one of the things that can be done is to plan the transmission line from the generator so that the electrical energy channeled can be maximized. In this study discussed the planning of high voltage air transmission lines from Kayan Hydropower to Grid 900 MW Kalimantan (Long Apari) with a transmission line length of 110 kms. From this study the basic distribution equipment is obtained through transmission overhead lines. The transmission overhead line uses a voltage of 150 kV consisting of 509 transmission towers with an average distance of 300 m. The conductor used is a type of ACSR 45/7 650 mm2 with a diameter of 3.44 cm (r = 1.702 cm) 2 conductor bundles with a 45Al / 7St arrangement, The sagging is produced 1.25 m for tower conditions with the same height. While the total losses along the channel amounted to 1369.5 kW. This transmission line planning is modeled in the form of visual design using PLS Cadd software.

Item Type: Thesis (Other)
Additional Information: RSE 621.319 Hat p-1 2019
Uncontrolled Keywords: Planning Transmission line 150 kV, Sagging, Andongan, PLS-Cadd.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK201 Electric Power Transmission
Divisions: Faculty of Architecture, Design, and Planning
Depositing User: Redi Permata Hati
Date Deposited: 21 Feb 2023 08:09
Last Modified: 21 Feb 2023 08:09
URI: http://repository.its.ac.id/id/eprint/63549