Airlisa, Yus Dwiki (2019) Perencanaan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Pada Struktur Bangunan Atas Pembangunan Apartment Caspian Grand Sungkono Lagoon Surabaya Dengan Metode Hazard And Operability Study (HAZOP). Diploma thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
10111815000032-Undergraduate Theses.pdf Download (9MB) | Preview |
Abstract
Pada tugas akhir ini penulis mengambil objek gedung apartment caspian grand sungkono lagoon yang memiliki 48 lantai terletak di Surabaya. Tema tugas akhir ini dapat membantu perusahaan menyusun sistem manajemen K3 perusahaan dan juga dapat membantu mengurangi kecelakaan kerja. Bangunan gedung ini akan ditinjau dari segi K3 pada lantai 2, 17 dan lantai 48. Untuk lantai 2 berada pada ketinggian 6 m, lantai 17 pada ketinggian 63,4 m dan lantai 48 pada ketinggian 172,7 m. Selain mengatasi bahaya, juga mengendalikan risiko dan menghitung biaya K3. Untuk identifikasi bahaya dan pengendalian risiko akan menggunakan Teknik Analisis HAZOP. Identifikasi bahaya akan mengacu pada peraturan – peraturan yang berlaku salah satunya adalah Peraturan Menteri No 05 Tahun 2014 tentang Sistem Manajemen K3. Untuk perencanaan anggaran biaya K3 sendiri akan mengacu pada Surat Edaran Menteri PU No.66 Tahun 2015 tentang perhitungan biaya SMK3. Pada proyek ini akan menggunakan 2 jenis metode pelaksanaan. Perbedaan metode pelaksanaan hanya pada penggunaan alat berat. Untuk metode 1 menggunakan alat berat tower crane dan concrete pump, sedangkan metode 2 akan menggunakan tower crane. Metode 1 akan dipakai untuk pengerjaan lantai 2. Sedangkan metode 2 akan digunakan untuk pengerjaan lantai 17 dan lantai 48. Identifikasi bahaya akan ditinjau dari faktor manusia, peralatan, proses, dan lingkungan kerja. Dari hasil analisis perencanaan ini didapatkan jumlah analisa potensi bahaya pada lantai 2 adalah 428 potensi bahaya, untuk lantai 17 adalah 474 potensi bahaya, dan untuk lantai 48 adalah 474 potensi bahaya. Jumlah dari potensi bahaya tiap lantai terdiri dari risiko ekstrim, risiko tinggi, risiko sedang, dan risiko rendah. Dari penilaian tersebut dapat dibuat pengendalian risiko yang dibuat untuk menyusun rencana kerja dan kebutuhan anggaran biaya K3. Hasil perhitungan anggaran biaya K3 pada proyek ini sejumlah Rp 1.647.774.000,00 (Satu Milyar Enam Ratus Empat Puluh Tujuh Juta Tujuh Ratus Tujuh Puluh Empat Ribu Rupiah).
================================================================================================================================
In this final project the author took the object of a 48-floor grand sungkono lagoon apartment building in Surabaya. The theme of this final project can help companies develop a company OSH management system and can help company develop a company OSH management system and can also help reduce workplace accidents. This building will be reviewed in terms of K3 on the 2nd, 17th and 48th floors. For the 2nd floor, it corresponds to the height of 6m, 17th floor at an altitude of 63,4m and the 48th floor at an altitude of 172,7m. In addition ti overcoming hazards, also controlling risks and calculating OHS costs.For hazard identification and risk control will use the HAZOP Analysis Technique. Hazard identification will refer to applicable regulations, one of which is Minister Regulation No. 05 of 2014 concerning K3 Management System. For K3 budget planning itself, it will refer to Minister of Public Works Circular Letter No. 66 of 2015 concerning calculation of SMK3 fees. In this project you will use 2 types of implementation methods. The difference in method of implementation is only on the use of heavy equipment. For method 1 using a tower crane and concrete pump equipment, while method 2 will use a tower crane. Method 1 will be used to work on the 2nd floor. While method 2 will be used for workmanship on the 17th and 48th floors. Hazard identification will be reviewed from human factors, equipment, processes, and work environment. From the results of this planning analysis the number of potential hazard analyzes on the 2nd floor is 428 potential hazards, for the 17th floor there are 474 potential hazards, and for the 48th floor are 474 potential hazards. The number of potential hazards per floor consists of extreme risk, high risk, moderate risk, and low risk. From these assessments, risk controls can be made to prepare work plans and K3 cost budget requirements. The result of the calculation of the K3 cost budget for this project is Rp 1.647.774.000,00 (One billion six hundred and forty-seven million seven hundred seventy four thousand rupiahs).
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | RSIS 690.831 4 Air p-1 2019 |
Uncontrolled Keywords: | Bangunan Gedung, Sistem Manajemen Keselamatan dan Kesehatan Kerja, HAZOP, Rencana Anggaran Biaya K3, Building, Occupational Safety and Health Management System (K3), HAZOP, Budget plan of Occupational Safety and Health Management System (OSH) |
Subjects: | T Technology > T Technology (General) > T55 Industrial Safety T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Airlisa Yus Dwiki |
Date Deposited: | 07 Jun 2023 05:45 |
Last Modified: | 07 Jun 2023 05:45 |
URI: | http://repository.its.ac.id/id/eprint/63960 |