Novitasari, Rizka (2019) Perhitungan Waktu Dan Biaya Pelaksanaan Erection Girder Dengan Metode Launcher Pada Pembangunan Jemabatan Proyek Jalan Tol Krian – Legundi – Bunder – Manyar (KLBM) Sta.21+800 – Sta.22+278. Diploma thesis, Institut Teknologi Sepuluh Nopermber.
Preview |
Text
10111510000003 - Undergraduate_Theses.pdf Download (17MB) | Preview |
Abstract
Dalam pelaksanaan proyek ada kalanya diperlukan suatu metode untuk menyelesaikan berbagai masalah di lapangan. Khususnya pada saat menghadapi kendala yang diakibatkan oleh kondisi di lapangan. Untuk itu, penerapan metode pelaksanaan yang digunakan haruslah mempertimbangkan beberapa hal salah satunya adalah kondisi lapangan. Kelancaran suatu proyek bergantung pada metode pelaksanaan yang digunakan. Karena metode pelaksanaan mempengaruhi jalannya suatu proyek, kebutuhan pekerja, analisa waktu proyek hingga analisa biaya proyek tersebut. Metode pelaksanaan dapat digunakan dalam segala aspek proyek, termasuk dalam dunia sipil, seperti pada proyek yang dibahas dalam Tugas Akhir ini yaitu pembangunan jembatan pada Proyek Jalan Tol KRIAN – LEGUNDI – BUNDER – MANYAR (KLBM). Pada penulisan Tugas Akhir ini meninjau metode pelaksanaan pembangunan jembatan Proyek Jalan Tol KRIAN – LEGUNDI – BUNDER – MANYAR (KLBM) STA. 21+800 – STA. 22+278. Lokasi jembatan yang ditinjau yaitu berada di Kecamatan Cerme, Kabupaten Gresik, Jawa Timur. Jembatan dengan bentang sepanjang 478meter menggunakan struktur PCI Girder. Metode pelaksanaan yang ditinjau adalah pemasangan girder atau biasa disebut dengan erection girder. Metode pelaksanaan erection girder yang direncanakan dalam penulisan Tugas Akhir ini yaitu menggunakan launcher, sedangkan dalam pelaksanaannya di lapangan menggunakan crane. Pemilihan metode pelaksanaan dalam penulisan Tugas Akhir ini bertujuan untuk memberikan metode alternative dengan mempertimbangkan kondisi lapangan proyek. Karena metode pelaksanaan berkaitan erat dengan biaya dan waktu pelaksanaan, maka tujuan hasil akhir dari Tugas Akhir ini adalah biaya dan waktu pelaksanaan erection girder dengan menggunakan Metode Launcher. Hasil yang diperoleh setelah melakukan proses pengolahan dan perhitungan dengan menggunakan metode launcher merupakan waktu pelaksanaan pekerjaan yaitu selama 176 hari dan dengan biaya yang dibutuhkan sebesar Rp. 91.120.783.800,00.
=================================================================================================================================
In the implementation of projects, there are times when a method is needed to solve various problems in the field. Especially when facing obstacles caused by certain conditions in the field. Due to that case, the use of the methods must take into consideration in several things. One of it is the condition in the field. The continuity of a project depends on the use of the implementation method. Because it affects the course of a project, the needs of workers, time analysis, and cost analysis. The implementation method can be used in all aspects of the project, including in the civil aspect, as in this Final Project will be discussed named the construction of bridges on the KRIAN Toll Road Project - LEGUNDI - BUNDER - MANYAR (KLBM). In this Final Project will be observing the implementation method of the bridge construction of the KRIAN Toll Road Project - LEGUNDI - BUNDER - MANYAR (KLBM) STA. 21 + 800 - STA. 22 + 278. The location of the bridge is located in Cerme District, Gresik Regency, East Java. The 478meter-long bridge uses the PCI Girder structure. The implementation method that is observed is in the scope of girder instalation or commonly called the girder erection. The implementation method of the girder erection in this Final Project will use Launcher, while in the field is using Crane. The implementation method’s aim is considered to provide alternatives method by considering the condition in the field. Because the implementation method is closely related to the cost and time analysis, therefore the goal of this Final Project is the cost and time implementation of the erection girder using the Launcher Method. The results obtained after carrying out the processing and calculation using the launcher method is the execution time of the work which is resulted 176 days of work and with the required cost of Rp. 91,120,783,800.00.
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | RSIS 692.5 Nov p-1 2019 |
Uncontrolled Keywords: | Launcher, Erection Girder, Waktu dan Biaya |
Subjects: | T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Novitasari Rizka |
Date Deposited: | 31 Jan 2024 08:08 |
Last Modified: | 31 Jan 2024 08:08 |
URI: | http://repository.its.ac.id/id/eprint/64271 |
Actions (login required)
View Item |