Rencana Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Struktur Gedung Fakultas Ilmu Sosial Universitas Negeri Malang dengan Modifikasi Pelat Metode Half Slab

Kandilasari, Meylana Arum (2019) Rencana Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Struktur Gedung Fakultas Ilmu Sosial Universitas Negeri Malang dengan Modifikasi Pelat Metode Half Slab. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000070-Undergraduate_Theses.pdf]
Preview
Text
10111815000070-Undergraduate_Theses.pdf

Download (26MB) | Preview

Abstract

Pada tugas akhir ini objek manajemen konstruksi yang direncanakan yaitu Proyek Gedung Fakultas Ilmu Sosial Universitas Negeri Malang yang memiliki luas gedung 10.584 m2 dan berlokasi di Jl. Semarang No.5 Malang. Gedung tersebut memiliki delapan lantai dan lantai atap menggunakan dak beton, serta terdapat tambahan struktur di lantai atap untuk rumah lift dan tangga. Untuk struktur bawah menggunakan pondasi bored pile, sedangkan untuk struktur atas menggunakan beton bertulang. Proyek ini menggunakan metode pengecoran beton cor in-situ untuk membangun struktur utamanya, sedangkan pada tugas akhir ini metode yang digunakan pada pelat dimodifikasi menjadi precast half slab untuk pelat lantai 2- lt. atap. Perhitungan biaya dan waktu pelaksanaan dihitung berdasarkan metode pelaksanaan yang digunakan sesuai dengan teori dan ilmu dari berbagai referensi yang disebutkan dalam kepustakaan serta dikaitkan dengan kondisi di lapangan. Sehingga dengan metode pelaksanaan yang tepat maka dihasilkan waktu dan biaya yang efektif. Sedangkan untuk penyusunan jadwal tiap item pekerjaan dilakukan dengan menggunakan bantuan software Microsoft Project dan Kurva S. Hasil akhir pada tugas akhir ini adalah rekapitulasi biaya pelaksanaan proyek, metode pelaksanaan yang digunakan, durasi pelaksanaan proyek, serta kurva S. Dari perhitungan biaya dan waktu yang telah dilakukan, diperoleh durasi pekerjaan selama 195 hari kerja dan total biaya langsung dan biaya tak langsung adalah sebesar Rp. 26.290.176.526 (Dua Puluh Enam Milyar Dua Ratus Sembilan Puluh Juta Seratus Tujuh Puluh Enam Ribu Lima Ratus Dua Puluh Enam Rupiah). Penyajian penjadwalan pada proyek pembangunan Proyek Gedung Fakultas Ilmu Sosial Universitas Negeri Malang menggunakan kurva S dan Microsoft Project.
================================================================================================================================
In this final project, the construction management object is the Social Sciences Faculty Building Project, Universitas Negeri Malang which has a building area of 10,584 m2 and located on Jl. Semarang No.5 Malang. The building has eight floors and roof floor using concrete, and there are additional structures on the roof floor for house lift and stair. For the lower structure using bored pile foundation, while for the upper structure using reinforced concrete. This project uses the in-situ cast concrete method to build the main structure, while in this final project the method used in the modified plate becomes the half slab precast for floor plates 2-roof Calculation of costs and implementation time is calculated based on the implementation method used in accordance with the theory and science of various references mentioned in the literature and associated with conditions in the field. So that with the right implementation method, it will produce time and cost effectively. While for the preparation of the schedule for each item of work carried out using Microsoft Project and S-Curve.The final results in this final project are recapitulation of project implementation costs, implementation methods used, duration of project implementation, and S. curve. From the calculation of the cost and duration taken, the duration of work is 195 working days and the total of direct cost and indirect cost worth Rp. 26.290.176.526 (Twenty Six Billion Two Hundred Ninety Million One Hundred Seventy Six Thousand Five Hundred Twenty Six Rupiah). Scheduling presentation on the construction project of the Faculty of Social Sciences Malang University Project uses S curve and Microsoft Project.

Item Type: Thesis (Other)
Additional Information: RSIS 690.73 Kan r-1 2019
Uncontrolled Keywords: biaya, durasi, halfslab precast, penjadwalan, kurva S
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Meylana Arum Kandilasari
Date Deposited: 30 Aug 2023 02:15
Last Modified: 30 Aug 2023 02:15
URI: http://repository.its.ac.id/id/eprint/64895