Alternatif Perencanaan Basement dan Pondasi Pada Proyek Pembangunan Apartment Grand Sungkono Lagoon Surabaya

Djuwari, Kresnadi Wicaksono (2019) Alternatif Perencanaan Basement dan Pondasi Pada Proyek Pembangunan Apartment Grand Sungkono Lagoon Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111745000006-Undergraduate_Theses.pdf]
Preview
Text
03111745000006-Undergraduate_Theses.pdf

Download (13MB) | Preview

Abstract

Apartemen sebagai salah satu solusi hunian dengan lahan yang terbatas, sangat membutuhkan area parkir yang luas. Karena area yang luas sulit didapatkan di kota besar seperti Surabaya, maka dibutuhkan struktur bawah tanah (basement) untuk mengatasi masalah keterbatasan lahan. Permasalahan ini juga ada pada proyek pembangunan apartemen grand sungkono lagoon, Surabaya. Bangunan yang terdiri dari 48 lantai diatas permukaan tanah tersebut memunyai 4 lantai basement mencapai 16,50 m. Pada saat pengujian tanah tidak ditemukannya muka air tanah. Perencanaan awal pondasi pada proyek tersebut menggunakan kombinasi pondasi tikar dengan bored pile berdiameter 100 cm .Perencanaan dinding basement menggunakan Contiguos Bored Pile (Secant Pile) dan metode konstruksi yang digunakan adalah metode Bottom Up.
Pada tugas akhir ini, akan dilakukan perbandingan harga material pembangunan basement dengan metode secant pile dan diaphragm wall dengan metode konstruksi Top Down dimana pembangunan pelat lantai dimulai dari ground floor sampai basement lantai empat. Penggalian dilakukan secara bertahap dengan pelat lantai sebagai bracing dinding basement. Setelah alternatif basement dan pondasi terpilih, maka dibandingkan dengan perencanaan eksisting yang ada pada proyek pembangunan apartemen grand sungkono lagoon dilihat dari segi biaya material.
Dari hasil perencanaan dinding basement dipilih diafragma wall dengan kedalaman penanaman dinding sedalam 35 m menggunakan tebal 100 cm dengan total biaya pekerjaan sebesar Rp 11.718.056.092 sedangkan untuk secant pile dengan kedalaman penanaman dinding sedalam 35 m menggunakan diameter 80 cm dengan jarak antar tiang 100 cm, total biaya pekerjaannya adalah Rp 12.759.652.706. Pondasi yang digunakan adalah tipe bored pile dengan diameter 80 cm mempunyai panjang 29 m dan diameter 100 cm dengan panjang 36 m dengan total biaya pekerjaan Rp 8.752.538.585
=============================================================================================================================
Apartments as one of the residential solutions with limited land, desperately need a large parking area. Because large areas are difficult to find in big cities like Surabaya, an underground structure (basement) is needed to overcome the problem of limited land. This problem also exists in the grand sungkono lagoon apartment development project, Surabaya. The building which consists of 48 floors above the land surface has 4 basement floors reaching 16.50 m. At the time of testing the soil does not find groundwater. The initial planning of the foundation on the project uses a combination of mat foundation with bored pile with a diameter of 100 cm. Basement wall planning uses Contiguos Bored Pile (Secant Pile) and the construction method used is the Bottom Up method.
In this final project, the basement will be design with the secant pile and diaphragm wall using Top Down analysis method and compared based on its material cost. The Top Down construction is a method where the construction of the floor plate starts from ground floor to the fourth floor basement. The excavation is carried out in stages with the floor plate as a basement wall bracing. After the alternative basement and foundation are selected, then compared to the existing planning in the grand sungkono lagoon apartment construction project in terms of material costs.
From the results of the basement wall planning, the diaphragm wall was selected with a depth of 35 m deep wall planting using 100 cm thick with a total work cost of Rp. 11,718,056,092 while for secant pile with a depth of 35 m deep wall planting using 80 cm diameter with 100 cm spacing, the total cost of the work is Rp 12,759.65,706. The foundation used is the type of bored pile with a diameter of 80 cm having a length of 29 m and a diameter of 100 cm with a length of 36 m with a total cost of work is Rp 8.752.538.585

Item Type: Thesis (Other)
Uncontrolled Keywords: Diaphragm Wall, Secant Pile, Foundation, Top Down, Apartemenet Grand Sungkono Lagoon
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > TH3000 Basements--Remodeling.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Kresnadi Wicaksono Djuwari
Date Deposited: 09 Jul 2024 02:20
Last Modified: 09 Jul 2024 02:20
URI: http://repository.its.ac.id/id/eprint/67834

Actions (login required)

View Item View Item