Estimasi Waktu Dan Biaya Pekerjaan Jembatan Sta 5+678 – Sta 5 +728 Pada Proyek Pembangunan Jalan Lingkar Luar Timur, Surabaya

Setiawan, Mochamad Agus (2019) Estimasi Waktu Dan Biaya Pekerjaan Jembatan Sta 5+678 – Sta 5 +728 Pada Proyek Pembangunan Jalan Lingkar Luar Timur, Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000037-Undergraduate_Theses.pdf]
Preview
Text
10111815000037-Undergraduate_Theses.pdf

Download (7MB) | Preview

Abstract

Proyek pembangunan Jalan Lingkar Luar Timur merupakan salah satu proyek yang dilaksanakan oleh Pemerintah Kota Surabaya. Jembatan ini memiliki bentang 30 m. Jembatan ini terdiri dari jembatan biasa dengan 2 abutment. Manajemen Pelaksanaan ini berisi tentang metode pelaksanaan, estimasi perhitungan volume pekerjaan, anlisa biaya dan jumlah kebutuhan peralatan.
Yang pertama kali dilakukan adalah merencanakan metode pelaksanaan dengan pertimbangan kondisi lokasi proyek. Setelah itu dilakukan perhitungan volume selanjutnya dihitung produktifitas alat sehingga bisa diketahui kebutuhan peralatan dan bisa mendapatkan waktu pelaksanaan yang efektif untuk setiap pekerjaan.
Dari perhitungan waktu dan biaya yang telah dilakukan, diperoleh durasi pekerjaan selama 186 hari kalender dan biaya pekerjaan senilai Rp. 7.851.144.632,09. Penyajian penjadwalan pekerjaan Pembangunan Jembatan STA 5+678 – STA 5+728 Pada Proyek Jalan Lingkar Luar Timur, Surabaya ini menggunakan kurva “S”.
===============================================================================================================================
The East Outer Ring Road construction project is one of the projects implemented by the Surabaya City Government. This bridge has a span of 30 m. This bridge consists of an ordinary bridge with 2 abutments. This Implementation Management contains the method of implementation, estimation of the calculation of work volume, cost analysis and the amount of equipment requirements.
The first thing to do is to plan the implementation method by considering the condition of the project location. After that, the next volume calculation is calculated, the productivity of the tool is calculated so that the equipment needs can be known and can get an effective implementation time for each job.
From the calculation of the time and costs that have been made, the duration of work is obtained for 186 calendar days and the work cost of Rp. 7.851.144.632,09. Job scheduling for Construction of the STA 5 + 678 - STA 5 + 728 Bridge In the East Outer Ring Road Project, Surabaya uses the "S" curve.

Item Type: Thesis (Other)
Additional Information: RSIS 624.22 Set e-1 2019
Uncontrolled Keywords: Estimasi biaya, Kurva “S”, Durasi waktu, Produktifitas alat, AHSP. Cost estimation, "S" curve, time duration, tool productivity, AHSP.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: Setiawan Mochamad Agus
Date Deposited: 09 Jul 2024 06:55
Last Modified: 09 Jul 2024 07:45