Modifikasi Perancangan Struktur Gedung Hotel Ibis Padang Dengan Menggunakan Balok Prategang Dan Sistem Srpmk Pada Daerah Gempa Tinggi Modifikasi Perancangan Struktur Gedung Hotel Ibis Padang Dengan Menggunakan Balok Prategang Dan Sistem Srpmk Pada Daerah Gempa Tinggi

Santi, Anita (2016) Modifikasi Perancangan Struktur Gedung Hotel Ibis Padang Dengan Menggunakan Balok Prategang Dan Sistem Srpmk Pada Daerah Gempa Tinggi Modifikasi Perancangan Struktur Gedung Hotel Ibis Padang Dengan Menggunakan Balok Prategang Dan Sistem Srpmk Pada Daerah Gempa Tinggi. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3114105011-paperpdf.pdf]
Preview
Text
3114105011-paperpdf.pdf - Published Version

Download (717kB) | Preview
[thumbnail of 3114105011-presentationpdf.pdf]
Preview
Text
3114105011-presentationpdf.pdf - Published Version

Download (2MB) | Preview
[thumbnail of 3114105011-undergraduate-theses.pdf]
Preview
Text
3114105011-undergraduate-theses.pdf - Published Version

Download (4MB) | Preview

Abstract

Dewasa ini beton prategang merupakan salah satu
teknologi struktur yang dikembangkan dan sering digunakan
untuk pembangunan gedung bertingkat yang memiliki bentang
yang cukup panjang tanpa ada kolom ditengah bentang.
Perancangan Gedung Hotel Ibis Padang dengan menggunakan
beton prategang ini merupakan salah satu aplikasi penggunaan
beton prategang pada gedung bertingkat.
Terdapat bebarapa modifikasi yang dilakukan dalam
perancangan Gedung Hotel Ibis ini antara lain pada lantai atap
dan lantai 12 dirancang menggunakan balok prategang. Balok
prategang pada gedung bertingkat memiliki kendala dari sifat
beton prategang yang getas. Oleh karena itu perlu perencanaan
khusus dalam desain balok prategang agar dapat bersifat daktail
yang cukup untuk menahan beban gempa. Cara memenuhi syarat
daktilitas tersebut yaitu menggunakan balok prategang parsial dan
metode perancangan struktur menggunakan Sistem Rangka
Pemikul Momen Khusus (SRPMK). Dimana sistem ini dirancang
untuk daerah rawan gempa sesuai peraturan SNI 1726:2012 dan
pembebanan sesuai peraturan SNI 2847:2013. Pada struktur ini
ii
Beban gempa dihitung dengan metode beban gempa dinamis
respons spectrum, dan analisa struktur menggunakan program
bantu SAP2000. Perancangan balok beton prategang pada
Gedung Hotel Ibis Padang ini memiliki dimensi 50/75, bentang
14,83 meter dengan PPR 69 % yang terdiri dari 1 tendon dengan
15 strand.
====================================================================
Now a day, prestressed concrete becomes one of structure
technology which being developed and it is often used in the
construction of multi-storey building which has wide span
without column in the middle of span. Construction of Hotel Ibis
in Padang is the one of applications which used prestressed
concrete in the multi-story building.
There were some modification that was done in the
construction of Hotel Ibis such as, roof floor and twelfth floor. It
was designed by using prestressed bar. But, prestressed bar in
multi-story building has problem because of its brittle character.
Special planning is needed due to the prestressed beam design so
that it can be earthquake resistance because of its ductility. Partial
prestressed bar is used to fulfil the ductility requirement beside
Bearer Special Moment Frame System (SRPMK) is also used as
the structure planning method. This system is designed for
earthquake fragile area and it appropriates with SNI 1726:2012
regulation and imposition as in SNI 2847:2013 regulation. On
this structure, the earthquake load was counted by using spectrum
dynamic response earthquake load method and it used SAP 2000
to analyse its structure. The planning of prestressed bar in Padang
iv
Ibis Hotel had 50/75 dimension, 14,83 meter of spreads with 69%
PPR which consists of 1 tendon that has 15 strands.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 693.542 San m
Uncontrolled Keywords: Balok Prategang, Modifikasi Gedung, Sistem Rangka Pemikul Momen Khusus, Hotel Ibis Padang.
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA444 Reinforced concrete
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: EKO BUDI RAHARJO
Date Deposited: 07 Oct 2019 08:52
Last Modified: 07 Oct 2019 08:52
URI: http://repository.its.ac.id/id/eprint/71032

Actions (login required)

View Item View Item