Perencanaan waktu dan estimasi biaya pelaksanaan pekerjaan struktur jembatan kali Sidoduwe Kabupaten Mojokerto Jawa Timur

Prasetiya, Denny Tri Budi (2015) Perencanaan waktu dan estimasi biaya pelaksanaan pekerjaan struktur jembatan kali Sidoduwe Kabupaten Mojokerto Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113040505-Presentation-3113040505-presentationpdf.pdf]
Preview
Text
3113040505-Presentation-3113040505-presentationpdf.pdf

Download (1MB) | Preview
[thumbnail of 3113040505-NonDegree.pdf]
Preview
Text
3113040505-NonDegree.pdf

Download (7MB) | Preview

Abstract

Seiring perkembangan jaman, suatu pembangunan
bertujuan untuk mencapai nilai ekonomis dari suatu proyek
dengan mengutamakan efesiensi waktu dan biaya pada suatu
pekerjaan. Jembatan Kali Sidoduwe dibangun pada jalan tol
Surabaya - Mojokerto Seksi IV. Jembatan ini terletak pada
STA 37+592 – STA 37+659, yang mana melintasi 1 buah
jalan desa dan sungai Kali Sidoduwe.
Mengacu dari latar belakang tersebut maka, dalam
tugas akhir ini penulis membahas mengenai perencanaan
waktu dan estimasi biaya pelaksanaan. Jembatan Kali
Sidoduwe ini mempunyai bentang sepanjang 66 m. Dengan
terdiri dari dua abutment dan dua pilar.
Berdasarkan hasil analisa proyek akhir ini,
pembangunan struktur Jembatan Kali Sidoduwe dapat
diselesaikan dalam waktu 310 hari. Dan diperlukan anggaran
biaya sebesar Rp 24.678.889.600 (Dua puluh empat miliar
enam ratus tujuh puluh delapan juta delapan ratus
delapan puluh sembilan ribu enam ratus).

========================================================================================================

With the development of times, development aims to
achieve an economic value of project with prioritize on
efficient time and cost of a job. Kali Sidoduwe bridge
built on toll road Surabaya - Mojokerto Section IV. The
bridge is located at STA 37 + 592 - STA 37 + 659, which
crosses 1 piece of village roads and river Kali Sidoduwe.
Referring to the background then, in this final project
the author discusses the planning time and the estimated
cost of construction work. This bridge Kali Sidoduwe
have span along 66 m. With consists of two abutments and
two pillars.
Based on the result of this analysis final project,
structure development bridge Kali Sidoduwe can be
solved during 310 days and need budget cost of Rp
24,678,889,600 (Twenty-four billion six hundred and
seventy-eight million eight hundred and eighty-nine
thousand six hundred).

Item Type: Thesis (Diploma)
Additional Information: RSS 624.2 Pra p
Uncontrolled Keywords: Jembatan Kali Sidoduwe, Anggaran Biaya Yang Diperlukan
Subjects: T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: - Taufiq Rahmanu
Date Deposited: 25 Nov 2019 07:52
Last Modified: 25 Nov 2019 07:52
URI: http://repository.its.ac.id/id/eprint/72027

Actions (login required)

View Item View Item