PLTU X merupakan pembangkit listrik bertenaga uap yang terletak di provinsi Lampung Selatan. Pada PLTU ini menggunakan boiler dengan tipe circulating fluidized bed. Teknologi Circulating Fluidized Bed adalah memanfaatkan udara bertekanan tinggi untuk menciptakan kondisi fluidisasi terhadap bed material yang terdiri dari pasir, abu bahan bakar, dan sorbent (limestone). Berdasarkan data downtime pada PLTU pada periode 2018-2019, ditemukan bahwa boiler tubingmemiliki waktu downtime palling tinggi dibandingkan dengan komponen lainnya. Untuk meningkatkan produktifitas pada Pembangkit Listrik Tenaga Uap penelitian ini bertujuan untuk mengurangi waktu downtime pada boiler tube, dimana kegagalan akan memiliki beberapa kemungkinan mekanisme kegagalan yang akan dicari pada penelitian ini. Untuk menyelesaikan permasalahan, penelitian ini dimulai dari melakukan identifikasi masalah, perumusan masalah, dan dilanjutkan dengan studi literatur. Kemudian penelitian memasuki tahap pengumpulan data dan pengolahan data untuk melakukan analisa akan kegagalan yang terjadi pada komponen terkait. Proses analisis dengan Reliability Centered Maintenance dimulai dari menganalisa fungsi sistem yang diteliti, kemudian mempelajari sistem pemeliharaan yang digunakan. Selanjutnya dicari penyebab shutdown oleh boiler tubing yang akan digunakan untuk mencari akar permasalahan. Setelah ditemukan akar-akar permasalahan tahap selanjutnya adalah dibuat rekomendasi maintenance task dengan berdasarkan NASA Logic Tree Analysis. Setelah dilakukan penelitian tentang sistem boiler tubing pada Circulating Fluidized Bed, dan dilaksanakan pendekatan dengan metode Reliabillity Centered Maintenance, analisis dilakukan pada sistem Economizer, Waterwall, Air Preheater, dan Superheater. Hasil identifikasi pada sistem tersebut adalah pada Waterwall dan Air Preheater kegagalan diakibatkan oleh korosi, dan pada Superheater kegagalan diakibatkan oleh kerusakan refractory. Analisis dengan Logic Tree Analysis ditemukan pada komponen tersebut dapat dilakukan Predictive Testing & Inspection
================================================================================================================================
PLTU X is a steam powered power plant located in Southern Lampung. This steam power plant utilized a Circulating Fluidized Bed Boiler that uses high pressure air to create fluidizing condition for the bed material. Based on the data collected from 2018 until 2019, it is known that boiler tube failure causes the most downtime compared to other components. To increase productivity in the steam powered plant this research aims to decrease the downtime. To solve the problem, the research starts by identifying the problem and formulating the problem to solve. Then the research goes into data collection and data processing to analyze the failure that occurs on each component. The analysis process of Reliability Centered Maintenance starts with analyzing the function of the system and studying the maintenace system that runs in the system. Afterwards, the cause of shutdown is searched to find the root cause. By finding the rootcause research continued to plan a maintenance task using the approach of Nasa Logic Tree Analysis The analysis is carried out on the economizer, waterwall, air preheater, and superheater systems. Result shows that the air preheater and waterwall failure are caused by corrosion, and in the superheater system failures are caused by refractory damage. Analysis with Logic Tree Analysis found that all of the failures can be prevented using Predictive Testing & Inspection maintenance method.

Item Type: Thesis (Other)
Additional Information: RSM 620.183 028 8 Pra p-1 2020
Uncontrolled Keywords: Boiler Tube, RCM, RCFA, Logic Tree Analysis, Economizer, Superheater, Waterwall
Subjects: T Technology > TJ Mechanical engineering and machinery
T Technology > TJ Mechanical engineering and machinery > TJ174 Maintenance and repair of machinery
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Norman Seno Prabowo
Date Deposited: 05 Mar 2025 01:37
Last Modified: 05 Mar 2025 01:37
URI: http://repository.its.ac.id/id/eprint/73943

Actions (login required)

View Item View Item