PEMODELAN MATEMATIS UNTUK MEREDAM FLUKTUASI KEBUTUHAN ALAT BERAT PROYEK

Tanujaya, Putra (2020) PEMODELAN MATEMATIS UNTUK MEREDAM FLUKTUASI KEBUTUHAN ALAT BERAT PROYEK. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211750025017-Master_Thesis.pdf]
Preview
Text
09211750025017-Master_Thesis.pdf

Download (23MB) | Preview

Abstract

Proyek merupakan serangkaian kegiatan yang dibatasi oleh waktu dan sumber daya. Semakin tinggi tingkat kompleksitas suatu proyek maka akan dibutuhkan pula sistem pengelolaan dan pengendalian proyek yang baik. Salah satu permasalahan yang sering terjadi pada proyek konstruksi adalah kesalahan dalam pengelolaan sumber daya berupa alat berat (heavy equipment). Hal tersebut dapat menimbulkan peningkatan biaya operasional, permasalahan dalam penjadwalan proyek serta permasalahan pembiayaan. Untuk menghindari permasalahan tersebut, maka perusahaan konstruksi perlu melakukan resource leveling.
Pada penelitian ini dikembangkan suatu pemodelan matematis binary integer programming untuk menyelesaikan permasalahan resource leveling alat berat pada suatu proyek konstruksi. Tujuan dari pemodelan matematis tersebut adalah untuk meminimalkan nilai deviasi kebutuhan sumber daya dengan menetapkan suatu nilai target dimana nilai target tersebut didapatkan berdasarkan nilai rata - rata kebutuhan alat berat pada proyek konstruksi.
Hasil yang didapatkan pada penelitian ini adalah pemodelan matematis yang dikembangkan dapat mengurangi deviasi kebutuhan alat berat (heavy equipment).
==================================================================================================================
Projects are a series of activities that are limited by time and resources. The higher level of complexity of a project, better management skill and project control system will be needed. One of problem which often occurs in construction projects is a failure in managing resources in the form of heavy equipment. This miss management will lead to increased operational cost, problems in project scheduling and financial probelms.
In this study, a binary integer programming model was developed to solve resource leveling problem in a construction projects. The aim of the mathematical modeling is to obtain a minimal deviation value from a certain target value where the targeted value is equal to average value of heavy equipment needs per day.
The result from this study is the mathematical models successfully minimize the deviation of heavy equipment needs in construction project.

Item Type: Thesis (Masters)
Uncontrolled Keywords: binary integer programming, pemodelan matematis, resource leveling binary integer programming, mathematical modeling, resource leveling
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis
Depositing User: Putra Tanujaya
Date Deposited: 11 Aug 2020 03:12
Last Modified: 31 May 2023 14:43
URI: http://repository.its.ac.id/id/eprint/77503

Actions (login required)

View Item View Item