IMPLEMENTATION METHODS TO BUILD MAIN DAM CONSTRUCTION OF GONDANG DAM IN KARANGANYAR DISTRICT CENTRAL JAVA

Moh. Ali Musyaffak, Ali (2020) IMPLEMENTATION METHODS TO BUILD MAIN DAM CONSTRUCTION OF GONDANG DAM IN KARANGANYAR DISTRICT CENTRAL JAVA. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000010_MOH.ALI MUSYAFFAK.pdf]
Preview
Text
10111500000010_MOH.ALI MUSYAFFAK.pdf

Download (6MB) | Preview

Abstract

Gondang Dam is located in Gondang Hamlet, Gempolan Village, Kerjo District, Karanganyar Regency, Central Java. The Gondang Dam was built to overcome problems that often occur around the Gondang Dam such as drought during the dry season and experiencing flooding during the rainy season and to prosper the people around the Gondang Dam who mostly work as farmers so they really need enough water to irrigate their rice fields. .
Gondang Dam is a mixed fill type dam with an upright waterproof core. In the implementation of the construction of the Gondang Dam, there are several types of work, among others, preparatory work and implementation facilities, evasion work, foundation excavation work, heap counstruction, and spillway construction work.
In the Gondang Dam bodies, there are several zones, namely the impermeable core zone, the filter zone, the random fill zone, and the rip rap zone. Therefore, the implementation method used is gradual hoarding.
With the construction of the Gondang Dam, it is hoped that it can meet the needs of irrigation water covering an area of 4,680 hectares, providing raw water 200 liters / second, hydropower, and as a flood reduction.

Item Type: Thesis (Diploma)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Moh. Ali Musyaffak
Date Deposited: 09 Sep 2020 07:04
Last Modified: 10 Jan 2024 00:48
URI: http://repository.its.ac.id/id/eprint/81840

Actions (login required)

View Item View Item