Kordinasi Proteksi Pada Sistem Distribusi Ring Pt Pupuk Kalimantan Timur Akibat Penambahan Pabrik 5 (Pkt-5)

Abdullah, Rizky Adam (2014) Kordinasi Proteksi Pada Sistem Distribusi Ring Pt Pupuk Kalimantan Timur Akibat Penambahan Pabrik 5 (Pkt-5). Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[img]
Preview
Text
2209100094-Undergraduate_Thesis.pdf - Published Version

Download (1MB) | Preview

Abstract

PT. Pupuk Kaltim adalah perusahaan produsen pupuk urea terbesar di Indonesia yang saat ini sedang melakukan penambahan pabrik. Dengan adanya penambahan beban maka PT Pupuk Kaltim juga melakukan penambahan daya yang dibangkitkan. Penambahan pembangkit baru dilakukan di pabrik PKT-5. Dengan pemasangan generator 2x30MW diharapkan dapat meningkatkan kinerja perusahaan. Penambahan pembangkit ini berpengaruh pada arus hubung singkat (Short Circuit Current) pada setiap bus terutama pada bus 33kV yang saling terintegrasi. Tujuan dari tugas akhir ini akan dilakukan setting koordinasi rele seperti pengaman diferensial pada setiap bus utama pada sistem intergrasi 33kV dan ground fault sebagai back up apa bila rele diferensial gagal mengamankan. Analisa pada tugas akhir ini diharapkan dapat membantu dalam mengamankan atau mencegah kerusakan pada peralatan dan jaringan listrik ============================================================================================== PT. Pupuk Kaltim is the largest producer company of fertilizer urea in Indonesia which is currently doing the addition of the factory. With the addition of the load then PT Pupuk Kaltim also did the addition of the power generated. The addition of new plants is done in factory PKT-5. With the installation of a generator of 2x30MW is expected to improve the company's performance. The addition of this plant effect on currents of short circuit (Short Circuit Current) on each bus is mainly on 33kV bus integrated with each other. The purpose of this final assignment will be done setting rele like differential protection coordination on any main bus on the system intergration 33kV and ground fault as a back up when the differential failed. Analysis on the final project is expected to help in securing or preventing damage to equipment and electricity networks

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.317 Abd k
Uncontrolled Keywords: Kontinuitas, Diferensial, Short Circuit Current, Ground Fault
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 13 Oct 2020 06:39
Last Modified: 13 Oct 2020 06:39
URI: http://repository.its.ac.id/id/eprint/82120

Actions (login required)

View Item View Item