Pemodelan Work Rate Pada Proyek Konstruksi Gedung Di Surabaya Dengan System Dynamic Untuk Mengoptimumkan Kinerja Biaya Dan Waktu

Widowati, Elok Dewi (2021) Pemodelan Work Rate Pada Proyek Konstruksi Gedung Di Surabaya Dengan System Dynamic Untuk Mengoptimumkan Kinerja Biaya Dan Waktu. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111950030009-Master_Thesis.pdf] Text
03111950030009-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2023.

Download (2MB) | Request a copy

Abstract

Kinerja waktu dan biaya dalam proses konstruksi sangat dibutuhkan untuk mengetahui tingkat pencapaian proyek berdasarkan perencanaannya. Namun pengukuran kinerja dalam industri konstruksi masih kuantitatif dan bersifat statis, sedangkan proyek konstruksi memiliki karakter yang unik, tidak pasti dan kompleks. Selain itu, berbagai faktor dapat mempengaruhi kinerja proyek sehingga menyebabkan perubahan secara dinamsi. Nilai work rate atau tingkat usaha untuk melaksanakan pekerjaan menjadi bersifat dinamis akibat pengaruh dari faktor tersebut. Selebihnya, work rate akan mempengaruhi besarnya indeks kinerja waktu dan biaya proyek. Akibatnya nilai indeks kinerja menjadi mudah berubah – ubah sesuai dengan faktor yang sedang mempengaruhinya. Walaupun demikian, indeks kinerja waktu dan biaya merupakan tolok ukur keberhasilan dari suatu proyek.
Penelitian ini dilakukan dengan tujuan untuk mengoptimumkan kinerja waktu dan biaya proyek dengan mengetahui faktor apa saja yang mempengaruhinya serta variabel apa yang paling dominan. Studi literatur dilakukan untuk mendapatkan variabel penelitian serta hubungannya. Dengan menggunakan pemodelan System Dynamic, dibentuk model awal berupa causal loop diagram yang bertujuan untuk menunjukkan hubungan antar faktor yang mempengaruhi work rate yang selanjutnya akan mempengaruhi kinerja waktu dan biaya proyek. Setelah faktor-faktor pengaruh divalidasi dengan kuesioner, dikembangkan stock flow diagram sebagai kelanjutan dari causal loop diagram bertujuan untuk mengimplementasikan model keterkaitan hubungan antar faktor dengan lebih rinci sehingga dapat menggambarkan kondisi nyata di lapangan. Kuesioner akan dilakuakan kepada manajer proyek, site engineer atau staf ahli sebagai expert judgement serta mengambil sampel data untuk diukur kinerja waktu dan biayanya pada proyek gedung yang berada di Surabaya. Hasil kuesioner akan memvalidasi variabel apa saja yang dapat mempengaruhi kinerja waktu dan biaya proyek serta seberapa besar signifikansi pengaruhnya.
Hasil base model, analisis sensitivitas dan penerapan skenario perbaikan diketahui bahwa variabel resource factor, environmental issue dan management factor mempengaruhi besarnya nilai work rate. Resource factor menghasilkan CPI tertinggi dan management factor menghasilkan SPI tertinggi pada uji sensitivitas. Sedangkan pada tahap skenario didapatkan hasil nilain indeks kinerja tertinggi pada model skenario optimistic dengan peningkatan 2,35% pada CPI dan 3.19% pada SPI lebih besar dari nilai indeks kinerja biaya dan waktu pada base model. Hasil dari tahap skenario pada penelitian ini dapat dijadikan dasar dalam menentukan strategi untuk memperoleh kinerja proyek konstruksi gedung yang optimum
===================================================================================================
Time and cost performance in the construction process is needed to determine the level of project achievement based on its planning. However, performance measurement in the construction industry is still quantitative and static, whereas construction projects have unique, uncertain and complex characters. In addition, various factors can affect project performance and cause changes dynamically. The work rate or level of effort to carry out work that is dynamic due to the influence of these factors. Furthermore, the work rate will affect project time and cost performance index. As a result, the performance index value was fluctuated according to the factors that had been influenced them. However, time and cost performances index are the benchmark of a project success.
This research is conducted with the aim to finding out what factors critical affecting schedule and time performance and the relationship between them in Surabaya’s building project. Literature reviews were conducted to obtain the research variables and their relationship. By choosing System Dynamic modeling, an initial model was designed through a causal loop diagram aims to show the relationship between factors that influence project time and cost performance. After the influence factors are validated with the questionnaire, stock flow diagram will be developed as a continuation of the CLD head to implementing the model of the relationship between factors in more detail with the result that it can describe the real conditions in the site. Then a questionnaire will be conducted to project managers, site engineers or expert staf as expert judgments and take data samples to measure the time and cost performance of building projects in Surabaya. The results of the questionnaire will validate what variables that influence time and cost performance of the project and how significance they would be influenced. From the results of the base model, sensitivity analysis and application of improvement scenarios, it is known that the resource factor, environmental issue and management factor variables affect the value of the work rate. Resource factors produce the highest CPI and management factors produce the highest SPI in the sensitivity test. Furthermore, scenario phase shows that the highest performance value was from the optimistic scenario model with 2.35% on the CPI and 3.19% on the SPI, which is greater than the index value on the base model. The result of the scenario phase in this research could be used as a reference in the strategy to achieve an optimum building construction project performance.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Causal Loop Diagram, Kinerja Biaya, Kinerja Waktu, Stock Flow Diagram, System Dynamic Causal Loop Diagram, Cost Performance, Schedule Performance, Stock Flow Diagram, System Dynamic
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis.
H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > TA Engineering (General). Civil engineering (General) > TA780.C29 Piling (Civil engineering)
T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: Elok Dewi Widowati
Date Deposited: 09 Mar 2021 04:36
Last Modified: 09 Mar 2021 04:36
URI: http://repository.its.ac.id/id/eprint/83783

Actions (login required)

View Item View Item