Perancangan Sistem Informasi Pengendalian Waktu Dan Biaya Terintegrasi Dengan Metode Earned Value Analysis (EVA)

Ingalogo, Senopati (2021) Perancangan Sistem Informasi Pengendalian Waktu Dan Biaya Terintegrasi Dengan Metode Earned Value Analysis (EVA). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111740000083-Undergraduate_Thesis.pdf] Text
03111740000083-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (2MB) | Request a copy

Abstract

Pembangunan harus memiliki arah dan tujuan yang jelas sehingga hasil yang diinginkan dari perencanaan bisa dicapai dengan optimal. Melakukan pengawasan, evaluasi, serta pengendalian terhadap masalah waktu dan biaya merupakan suatu keharusan dalam kegiatan proyek untuk mengetahui efektivitas dan kinerja dari pelaksanaan suatu proyek. Sehingga dari hal tersebut dapat diprediksi waktu berakhirnya proyek dan besarnya biaya yang dibutuhkan untuk menyelesaikan proyek apabila proyek mengalami keterlambatan dalam penyelesaiannya. Salah satu metode yang digunakan untuk melakukan pengendalian waktu dan biaya proyek adalah Earned Value Analysis (EVA), meskipun EVA adalah metode yang baik untuk pengendalian waktu dan biaya proyek tetapi kontraktor di Indonesia belum sepenuhnya menerapkan EVA dalam pengelolaan proyek. Begitu pula dengan penggunaan sistem informasi dimana pengelolaan proyek di Indonesia masih belum optimal dalam menerapkannya.
Dengan menggunakan sistem informasi tentu pelaksanaan proyek konstruksi akan menjadi lebih mudah dan efisien dalam pengelolaannya. Keterlambatan suatu pekerjaan dapat dengan cepat diketahui sehingga perbaikan dapat cepat dilakukan dan langkah pencegahan dapat ditentukan. Disamping itu dalam praktiknya perhitungan EVA umumnya dikerjakan dalam perangkat lunak Microsoft Excel dengan metode manual. Sedangkan dengan program sistem informasi maka perhitungan EVA yang tadinya dilakukan secara manual dalam perangkat lunak Microsoft Excel dapat dilakukan secara otomatis dalam program sistem informasi yang dibuat dalam penelitian tugas akhir ini.
Oleh sebab itu dalam penelitian ini dirancang sistem informasi pengendalian waktu dan biaya terintegrasi dengan Metode Earned Value Analysis (EVA) menggunakan Lingkungan Pengembangan Terpadu (IDE) Microsoft Visual Studio Community 2019. Hasil atau output dari program sistem informasi yang dikembangkan dalam penelitian ini diharapkan mampu mengakomodasi permasalahan tersebut dengan membuat proses pengendalian proyek dan perhitungan EVA bisa dikerjakan secara otomatis dalam program sistem informasi. Kemudian diharapkan juga sistem informasi yang dikembangkan memiliki tampilan antarmuka pengguna (user interface) yang mudah dimengerti (user friendly) sehingga akan memudahkan pengguna dalam melakukan pengendalian dan analisa kinerja proyek, selain itu diharapkan dengan sistem informasi ini dapat meningkatkan ketelitian dalam perhitungan.
======================================================================================================
Construction must have clear directions and goals so that the desired results from planning can be achieved optimally. Supervising, evaluating, and controlling time and cost issues is a mandatory in project activities to determine the effectiveness and performance of implementing a project. So from this it can be predicted that the project expiration time and the amount of costs needed to complete the project if the project is delayed in completion. One of the methods used to control project time and costs is Earned Value Analysis (EVA), although EVA is a good method for controlling project time and costs, but contractors in Indonesia have not fully implemented EVA in project management. Likewise with the use of information systems where project management in Indonesia is still not optimal in implementing it.
By using the information system, the implementation of construction projects will be easier and more efficient in its management. Delays in a job can be quickly identified so that repairs can be made quickly and preventive measures can be determined. Besides that, in practice, EVA calculations are usually done with Microsoft Excel software using manual methods. Whereas with the information system program, the calculation of EVA which was done manually with Microsoft Excel software can be done automatically in the information system program created in this final project research.
Therefore, in this final project research, an integrated time and cost control information system was designed with the Earned Value Analysis (EVA) Method using the Integrated Development Environment (IDE) of Microsoft Visual Studio Community 2019. The results or outputs of the information system program developed in this research are expected to be able to accommodate these problems by making the process of project controlling and calculating EVA can be done automatically in the information system program. Then it is also expected that the developed information system has a user interface that is easy to understand (user friendly) so that it will make it easier for users to control and analyze project performance, besides that it is expected that this information system can increase accuracy in calculations.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Earned Value Analysis, Pengendalian Waktu dan Biaya, Sistem Informasi, Microsoft Visual Studio Community 2019, Earned Value Analysis, Time and Cost Control, Information System, Microsoft Visual Studio 2019
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Senopati Ingalogo
Date Deposited: 07 Aug 2021 05:17
Last Modified: 07 Aug 2021 05:17
URI: http://repository.its.ac.id/id/eprint/85052

Actions (login required)

View Item View Item