Saputra, Bayu Firman (2021) Laporan Magang Industri di PT. PAL Indonesia (Persero). Project Report. [s.n.], [s.l.]. (Unpublished)
Preview |
Text
10211710010117_Project_Report.pdf - Accepted Version Download (14MB) | Preview |
Abstract
Dalam rentang waktu beberapa tahun, kapal pasti melakukan perawatan, perbaikan dan pemeriksaan. Perawatan, perbaikan dan pemeriksaan yang utama adalah mesin kapal. Dalam uji performa mesin KRI teluk celukan bawang - 532 setelah di overhaul di bengkel test bench dan melalui perhitungan, didapatkan hasil bahwa mesin dengan tipe MTU 16V595TE70L masih dapat mencapai performa maksimal dan seperti kondisi baru. Selain itu juga dilakukan Ultrasonic Test untuk mendekteksi keretakan dan kebocoran pada lambung kapal, sehingga ketika kapal beroperasi tidak terjadi kebocoran.
======================================================================================================
In the span of a few years, ships must carry out maintenance, repairs and inspections. The main maintenance, repair and inspection is the ship's engine. in the performance test of the KRI Teluk Celukan Bawang - 532 engine at the test bench workshop and through calculations, it was found that the engine with the MTU type 16V595TE70L can still achieve maximum performance and is like new condition. In addition, Ultrasonic Test is also carried out to detect cracks and leaks on the ship, so that when the ship is operating there is no leakage.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Kapal, Uji Performa, Test Bench, Non Destructive Test, Ultrasonic Test |
Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ785 Internal combustion engines. Spark ignition |
Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
Depositing User: | Bayu Firman Saputra |
Date Deposited: | 23 Feb 2022 05:26 |
Last Modified: | 04 Apr 2023 08:05 |
URI: | http://repository.its.ac.id/id/eprint/85304 |
Actions (login required)
View Item |