Bhaskara, Ida Bagus Abirama (2021) Optimasi Biaya dan Waktu pada Pekerjaan Arsitektur Gedung MIPA Tower ITS Menggunakan Pendekatan Heuristic Modelling. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
03111740000063-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (3MB) |
Abstract
Dalam suatu proyek konstruksi terdapat rencana dan jadwal pelaksanaan proyek untuk batas penyelesaian sebuah pekerjaan. Namun sering ditemukan pelaksanaan pekerjaan di lapangan yang tidak sesuai dengan rencana dan jadwal yang sudah ditetapkan sehingga mengakibatkan keterlambatan penyelesaian proyek. Untuk mengatasi keterlambatan tersebut maka perlu dilakukan optimasi biaya dan waktu pada proyek tersebut. Proyek yang ditinjau adalah proyek konstruksi Gedung MIPA Tower ITS pada tahap IV. Dari data sekunder yang didapatkan dapat dilihat bahwa terjadi deviasi sebesar -17.08% pada pelaksanaan proyek sehingga diperlukan optimasi pada pekerjaan yang sedang dilaksanakan pada proyek. Lingkup pekerjaan tersebut adalah pekerjaan arsitektur. Tujuan dari penelitian ini adalah untuk: 1) Mendapatkan model percepatan optimasi biaya dan waktu menggunakan pendekatan Algoritma Genetika. 2) Mendapatkan hasil percepatan dengan tambahan biaya langsung minimum menggunakan metode heuristik (Algoritma Genetika) pada data proyek yang ditinjau. Metode yang digunakan dalam penelitian ini adalah metode heuristik Algoritma Genetika. Dari data yang didapatkan akan dilakukan percepatan durasi dengan batasan yang telah ditentukan. Data yang digunakan pada penelitian ini adalah data sekunder berupa jadwal proyek dan Rencana Anggaran Biaya (RAB) dari proyek konstruksi Gedung MIPA Tower ITS pada tahap IV. Langkah-langkah dalam penelitian ini dimulai dari melakukan studi literatur, menentukan metode penelitian, melakukan pengumpulan data, menentukan batasan-batasan yang akan digunakan, Menyusun model persamaan heuristik, melakukan optimasi, mendapatkan hasil paling optimum, dan menarik kesimpulan dan saran. Hasil yang didapatkan dari penelitian ini adalah model optimasi dengan pendekatan Algoritma Genetika, dan hasil terbaik optimasi dengan penambahan biaya langsung minimum adalah pada lantai 4 dengan persentase tambahan biaya sebesar 0.507% dari upah pekerja awal yaitu Rp.2.312.214,00 dan durasi percepatan sebesar 7 hari. ===================================================================================================== A construction project has a plan and implementation schedule to execute jobs within the limited time available. But in most times there have been delays in the project completion due to the field execution which did not match with the plan and schedule that has been made. To overcome this issue there needs to be a time and cost optimization. The project that is going to be used in this research is the MIPA Tower ITS construction project. It can be seen from the secondary data that is obtained that there is a 17.08% deviation in the project execution, which means that there is the need to optimize the job within the project. The scope of the job is architectural jobs. The purpose of this research are as such: 1) To obtain a time and cost optimization model with Genetic Algorithm approach. 2) To obtain the optimization result with the minimum direct cost addition with heuristic method (Genetic Algorithm) in the project data that is used. The method that is used in this research is the heuristic method Genetic Algorithm. The duration acceleration will be executed with the data available. The data that is used in this research is the secondary data in the form of project schedule and budget plan from the MIPA Tower ITS construction project. The steps of this research starts from literature study, determination of research method, data collection, determination of research boundary, construction of heuristic model, optimization to get the best result, and draw conclusion and suggestion. The result from this research is an optimization model based on Genetic Algorithm and the best optimization result with the smallest addition of direct cost is the result of the 4th floor with an addition percentage of 0.507% from the initial work force wages which is Rp.2.312.214,00 and an acceleration of 7 days.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Optimasi, Algoritma Genetika, Gedung MIPA Tower ITS, Proyek Konstruksi, Optimization, Genetic Algorithm, MIPA Tower ITS, Construction Project |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Ida Bagus Abirama Bhaskara |
Date Deposited: | 19 Aug 2021 03:20 |
Last Modified: | 19 Aug 2021 03:20 |
URI: | http://repository.its.ac.id/id/eprint/87928 |
Actions (login required)
View Item |