Pardede, David Yeremia (2021) Analisis Keterlambatan Proyek Serpong Garden Apartment Menggunakaan Metode RCA (3 Legged 5-Why Analysis And Fishbone Diagram Method). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
03111740000066-Undergaraduate_Thesis.pdf - Accepted Version Download (525kB) | Preview |
Abstract
Dalam pembangunan proyek konstruksi pada umumnya mempunyai rencana pelaksanaan yang menyangkup jadwal pelaksanaan proyek dimulai, kapam proyek diselesaikan, dan bagaimana proyek tersebut dikerjakan. Dalam pembuatan perencanaan tersebut diharapkan tidak terjadi keterlambatan agar tidak mengakibatkan peningkatan biaya proyek. Namun, dalam pelaksanaan proyek Serpong Garden Apartment mengalami keterlambatan.
Penelitian ini bertujuan menganalisis apakah yang menjadi akar penyebab timbulnya permasalahan keterlambatan dalam Pembangunan Proyek Serpong Garden Apartment. Metode yang digunakan dalam penelitian adalah Root Cause Analysis (RCA). Yang dimana dalam penggunaan metode ini akan dibantu dengan tools 3-Legged 5 Whys dan fishbone diagrams.
Dari hasil analisa yang dilakukan dalam Tugas Akhir ini, didapatkan bahwa proyek pada minggu ke-149 memiliki deviasi progres kumulatif sebesar -8,5631% yang dimana seharusnya pada minggu itu progres kumulatif sudah mencapai 100%. Kemudian setelah dilakukan analisa item pekerjaan terlambat, ditemukan penyebab keterlambatan disebabkan oleh pekerjaan finishing tower B & C dan instalasi MEP. Adapun faktor penyebab keterlambatan dari pekerjaan finishing tower B & C disebabkan oleh faktor man (Sumber daya manusia), material, mother nature, dan metode. Sedangkan untuk pekerjaan instalasi MEP disebabkan oleh faktor Man (Sumber Daya Manusia) dan juga Material.
==================================================================================================
In the construction of construction projects, in general, ther is an implementation plan that includes a schedule for starting the project, when the project will be completed, and how the procject will be carried out. In making the plan, it is hoped tha ther will be no delays so as not to result in an increase in project cost. However, the implementation of the Serpong Garden Apartment project experienced delays.
This study aims to analyze what is the root cause of delays in the construction of the Serpong Garden Apartment Project. The method used in this research is Root Cause Analysis (RCA). Which in the use of this method will be assisted by tools 3-Legged 5 Whys and fishbone diagrams.
From the results of the analysis carried out in this Final Project, it was found that the project in the 149th week had a cumulative progress deviation of -8,5631% which should have reached 100% in the cumulative progress week Then after analyzing the late work items, it was found that the cause of the delay was caused by the finishing work of the B & C tower and MEP installation. The main factors that cause delays in the finishing work of tower B & C are caused by man factors (human resources), materials, mother nature, and methods. As for the MEP installation work, it is caused by the Man (Human resources) and material factors.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Factors causing project delays, root cause analysis, fishbone diagrams, 3 legged 5-why analysis, construction project faktor penyebab keterlambatan proyek, root cause analysis, fishbone diagrams, 3 legged 5-why analysis, proyek konstruksi |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | David Yeremia Pardede |
Date Deposited: | 20 Aug 2021 05:46 |
Last Modified: | 31 Oct 2024 05:56 |
URI: | http://repository.its.ac.id/id/eprint/88009 |