Estimasi Waktu Dan Biaya Proyek Pembangunan 6 (Enam) Ruas Jalan Tol Dalam Kota Jakarta Tahap 1 Ruas Semanan – Sunter Dan Sunter – Pulo Gebang Seksi A Kelapa Gading – Pulo Gebang (Sta. 24+971.150 – Sta. 25+812.307)

Brahmacari, Arkananta Rifda (2021) Estimasi Waktu Dan Biaya Proyek Pembangunan 6 (Enam) Ruas Jalan Tol Dalam Kota Jakarta Tahap 1 Ruas Semanan – Sunter Dan Sunter – Pulo Gebang Seksi A Kelapa Gading – Pulo Gebang (Sta. 24+971.150 – Sta. 25+812.307). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710010034-Undergraduate_Thesis.pdf] Text
10111710010034-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (37MB) | Request a copy

Abstract

Proyek pembangunan 6 (enam) ruas jalan tol dalam kota jakarta tahap 1 ruas semanan – sunter dan sunter – pulo gebang seksi A kelapa gading – pulo gebang merupakan salah satu upaya pemerintah untuk memajukan Indonesia terutama Jakarta dalam bidang transportasi yang mana bertujuan untuk mengurangi kemacetan dan menunjang akses lalu lintas di Jakarta utara. Proyek ini dilaksanakan oleh KSO PT. Jaya Konstruksi dan PT. Adhi Karya sebagai kontraktor, dan KSO PT. Jaya CM, PT. Virama Karya, PT. Cipta Strada sebagai konsultan. 6 (enam) Ruas Jalan Tol Dalam Kota Jakarta ini terdiri dari 6 ruas dan secara keseluruhan memiliki Panjang total 69,77 kilometer. Perhitungan estimasi waktu dan biaya ini meliputi berbagai macam pekerjaan yang dimulai dari pekerjaan struktur bawah dan struktur atas yaitu, Pembersihan lahan, pekerjaan Borepile, pekerjaan Pilecap, pekerjaan Kolom atau Pier, pekerjaan Pierhead, pekerjaan LRB (Lead Rubber Bearing), pekerjaan Erection Box Girder, pekerjaan expansion joint, dan pekerjaan Barrier. Agar mendapatkan perhitungan biaya, waktu, dan produktivitas yang tepat dan sesuai, digunakan HSPK Kota Jakarta sebagai acuan. Serta mengambil referensi dari berbagai literatur dan jurnal mengenai estimasi waktu dan biaya. Hasil dari Analisa tersebut yaitu durasi pada setiap pekerjaan dan rencana anggaran biaya pelaksanaa proyek. Pada Proyek pembangunan 6 (enam) ruas jalan tol dalam kota jakarta tahap 1 ruas semanan – sunter dan sunter – pulo gebang seksi A kelapa gading – pulo gebang (STA. 24+971.150 – STA. 25+812.307) ini diperoleh durasi ) pada pekerjaan persiapan, pekerjaan struktur atas dan bawah diselesaikan dalam waktu 572 Hari. Dengan asumsi bahwa hari sabtu masuk dan minggu libur dengan jam kerja normal, tanpa lembur yaitu 7 jam per hari. Dari pukul 08.00 – 16.00 dan 1 jam istirahat pada pukul 12.00 – 13.00. Total biaya pekerjaan tersebut sebesar Rp. 351.896.714.940 termasuk biaya K3 sebesar 2,5%. Dan PPN 10%. Pengendalian pelaksanaan proyek harus dilakukan dengan sebaik mungkin termasuk dalam penjadwalan kebutuhan sumber daya agar kedepannya tidak menimbulkan pembengkakan biaya dan keterlambatan proyek, tanpa mengabaikan kualitas dan kuantitas sumber daya
=====================================================================================================
The construction project of 6 (six) sections of the Jakarta inner city toll road, phase 1, the Semanan – Sunter and Sunter – Pulo Gebang sections, section A, Kelapa Gading – Pulo Gebang is one of the government's efforts to advance Indonesia, especially Jakarta in the transportation sector, which aims to reduce congestion and reduce congestion. support traffic access in North Jakarta. This project is implemented by KSO PT. Jaya Construction and PT. Adhi Karya as contractor, and KSO PT. Jaya CM, PT. Virama Karya, PT. Cipta Strada as a consultant. The 6 (six) sections of the Jakarta Inner City Toll Road consist of 6 sections and in total have a total length of 69.77 kilometers. The calculation of this estimated time and cost includes various kinds of work starting from lower structure work and upper structure work, namely, land clearing, Borepile work, Pilecap work, Column or Pier work, Pierhead work, LRB (Lead Rubber Bearing) work, Erection Box Girder work , expansion joint work, and Barrier work. In order to get a precise and appropriate calculation of costs, time, and productivity, the Jakarta City HSPK is used as a reference. As well as taking references from various literatures and journals regarding time and cost estimation. The results of the analysis are the duration of each job and the project implementation budget plan. In the construction project of 6 (six) sections of the Jakarta inner city toll road, phase 1, the semanan – sunter and sunter – pulo gebang sections, section A, Kelapa Gading – Pulo Gebang (STA. 24+971.150 – STA. 25+812,307) are obtained for the duration of the work. preparation, the work of the upper and lower structures was completed within 572 Days. Assuming that Saturdays still working and Sundays are day off with normal working hours, without overtime, which is 7 hours per day. From 08.00 – 16.00 and 1 hour break at 12.00 – 13.00. The total cost of the work is Rp. 351.896.714.940 including the OHS fee of 2.5%. and SDT 10%. Control of project implementation must be carried out as well as possible including scheduling resource requirements so that in the future it does not cause cost overruns and project delays, without neglecting the quality and quantity of resources.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Estimasi waktu dan biaya, Jalan tol
Subjects: T Technology > T Technology (General)
T Technology > T Technology (General) > T56.8 Project Management
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc.
T Technology > TH Building construction > TH1461 Concrete construction.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Arkananta Rifda Brahmacari
Date Deposited: 30 Aug 2021 04:21
Last Modified: 30 Aug 2021 04:21
URI: http://repository.its.ac.id/id/eprint/90443

Actions (login required)

View Item View Item