Bulqis, Dwi Indah Malikal (2021) Perhitungan Waktu dan Rencana Anggaran Biaya Pelaksanaan pada Pembangunan Struktur Gedung Hotel Ibis Budget Diponegoro Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
10111710010029-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2023. Download (19MB) | Request a copy |
Abstract
Kebutuhan konstruksi Gedung di Indonesia dari tahun ke tahun semakin meningkat, seiring dengan terus meningkatnya populasi saat ini di berbagai macam daerah di seluruh pelosok negeri, sehingga mau tidak mau jasa konstruksi dalam perencanaan pembangunan gedung dituntut untuk merencanakan pembangunan infrastruktur dengan lebih cepat dan juga dengan harga terjangkau. Maka dari itu perencanaan waktu dan biaya pelaksanaan suatu proyek harus diperhitungkan dan dipertimbangkan dengan baik agar memperoleh hasil yang maksimal.
Gedung Hotel Ibis Budget Diponegoro Surabaya memiliki luas bangunan 568 m2, terdiriri 9 (sembilan) lantai dengan struktur atap baja, struktur pondasi tiang pancang serta struktur atas menggunakan beton bertulang. Metode pelaksanaan yang digunakan dalam pembangunan Gedung Hotel Ibis Budget Diponegoro Surabaya adalah secara konvensional, yang mana pengecorannya dengan cast in situ.
Biaya pelaksanaan dihitung berdasarkan analisa yang sesuai antara literatur yang digunakan maupun peraturan yang berlaku untuk mendapatkan kesesuaian dengan kondisi pelaksanaan lapangan. Sedangkan pada perhitungan waktu pelaksanaan dilakukan analisa mulai dari kapasitas produksi, produktivitas, durasi dan penyusunan jadwal setiap pekerjaan dimana hal ini dilakukan dengan menggunakan alat bantu Microsoft Project.
Dari hasil analisa perhitungan tersebut diperoleh waktu pelaksanaan pembangunan pada Gedung Hotel Ibis Budget Diponegoro Surabaya menggunakan metode konvensional adalah 6 bulan 4 hari atau 184 hari kalender dengan total biaya pelaksanaan sebesar Rp. 12.202.452.429 (Dua Belas Milyar Dua Ratus Dua Juta Empat Ratus Lima Puluh Dua Ribu Empat Ratus Dua Puluh Sembilan Rupiah), yang berarti per meter persegi membutuhkan biaya sebesar Rp. 2.387.021,00 (Dua Juta Tiga Ratus Delapan Puluh Tujuh Ribu Dua puluh Satu Rupiah).
======================================================================================================
Building Construction needs in Indonesia is increasing year by year, along with the current population development in various regions throughout the country, so that inevitably construction services in building construction planning are required to plan infrastructure development faster and at a lower price. Therefore, planning the time and cost of implementing a project must be calculated and considered properly in order to obtain maximum results.
Ibis Budget Diponegoro Surabaya Hotel with a building area of 568 m2, has 9 (nine) floors with a steel roof and spun pile foundation on the bottom structure and upper structure using reinforced concrete. The implementation method used in the construction of the Ibis Budget Diponegoro Surabaya Hotel is the cast in-situ method. With this method, concrete work is carried out conventionally.
Implementation costs are calculated based on the appropriate analysis between the literature used and the applicable regulations to get conformity with the conditions of field implementation. While the calculation of the implementation time is analyzed starting from the production capacity, productivity, duration and scheduling of each job where this is done by using Microsoft Project tools.
From the results of the analysis of the calculation, it is known that the implementation time of the project with the total implementation costs in the Ibis Budget Diponegoro Surabaya Hotel. From the results of the calculation analysis, it is known that the implementation time of the project is 6 months 4 days or 184 days with a total implementation cost Rp. 12.202.452.429 (Twelve Billion Two Hundred Two Million Four Hundred Fifty Two Thousand Four Hundred Twenty Nine Rupiahs), which means per square meter of building will cost Rp. 2.387.021,00 (Two Million Three Hundred Eighty Seven Thousand Twenty One Rupiahs).
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Cast in Situ, biaya pelaksanaan, waktu pelaksanaan proyek, implementation costs, project implementation time. |
Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | DWI INDAH MALIKAL BULQIS |
Date Deposited: | 25 Aug 2021 22:08 |
Last Modified: | 25 Aug 2021 22:08 |
URI: | http://repository.its.ac.id/id/eprint/90545 |
Actions (login required)
View Item |