Perhitungan Biaya dan Waktu Pelaksanaan Proyek Pembangunan Rusun Rawa Buntu Mahata Serpong Tower B2

Hawari, Muhammad Dzaky (2021) Perhitungan Biaya dan Waktu Pelaksanaan Proyek Pembangunan Rusun Rawa Buntu Mahata Serpong Tower B2. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710013034-Undergraduate_Theses.pdf] Text
10111710013034-Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (25MB) | Request a copy

Abstract

Proyek Pembangunan Rusun Rawa Buntu Mahata Serpong Tower B2 terletak di Jl. Stasiun Rawa Buntu No. 29 Kelurahan Rawa Buntu Kecamatan Serpong Kota Tangerang Selatan. Proyek ini merupakan salah satu bagian dari Proyek Pembangunan Rusun Rawa Buntu Mahata Serpong yang terbagi atas 1 podium dan 3 tower (tower A, tower B1, dan tower B2). Pada Proyek Pembangunan Rusun Rawa Buntu Mahata Serpong Tower B2 ini dibangun oleh PT. Adhi Karya (Persero) Tbk. selaku kontraktor utama, terdiri atas pembangunan 1 podium (4 lantai) dan 1 tower (31 lantai). Bangunan ini memiliki luas bangunan ±35,068.80 m dengan tinggi bangunan 108,65 m. Pada proyek akhir ini, cakupan tinjauan adalah lantai 1 sampai lantai 12.

Pada Proyek Pembangunan Rusun Rawa Buntu Mahata Serpong Tower B2 terdiri dari pekerjaan struktur bawah, pekerjaan struktur podium, dan pekerjaan struktur atas. Pekerjaan struktur bawah meliputi pekerjaan pondasi menggunakan pondasi borepile dan raft. Sedangkan untuk pekerjaan podium dan pekerjaan struktur atas meliputi pekerjaan kolom, balok, pelat dan tangga menggunakan metode pengecoran cast in situ. Dalam proyek pembangunan ini memiliki volume pekerjaan yang sangat besar dan memiliki waktu yang terbatas, oleh karena itu dibutuhkan perhitungan biaya pelaksanaan dan waktu pelaksanaan sesuai dengan metode pelaksanaan yang digunakan berdasarkan teori dan referensi dari literatur-literatur serta dihubungkan dengan hasil analisa survei lapangan atau proyek. Sehingga dengan menggunakan metode pelaksanaan yang tepat maka akan tercipta perencanaan biaya dan waktu yang efisien dan efektif. Dalam perhitungan biaya pelaksanaan dimulai dengan melakukan perhitungan biaya pelaksanaan meliputi harga material, upah pekerja, dan sewa alat. Sedangkan perhitungan waktu pelaksanaan dimulai dengan melakukan perhitungan volume, produktivitas, durasi, dan sumber daya tiap item pekerjaan. Untuk penyusunan jadwal tiap item pekerjaan, digunakan aplikasi bantu yaitu Microsoft Project. Sedangkan untuk penyajian hasil penjadwalan menggunakan Kurva S. Hasil akhir yang dicapai pada proyek akhir ini meliputi rekapitulasi durasi pelaksanaan proyek, biaya pelaksanaan proyek, metode pelaksanaan, serta kurva S.

Dari hasil analisa, didapatkan durasi pelaksanaan pekerjaan selama 190 hari dengan jumlah biaya pelaksanaan pekerjaan sebesar Rp.23.485.250.770.
=======================================================================================================
The Rawa Buntu Mahata Serpong Tower B2 Project is
located at Jl. Stasiun Rawa Buntu No. 29 Kelurahan Rawa Buntu
Kecamatan Serpong Kota Tangerang Selatan. This project is one
of the part of the Rawa Buntu Mahata Serpong Project which is
divided into 1 podium and 3 towers (Tower A, Tower B1, and
Tower B2). This project is build by PT. Adhi Karya (Persero) Tbk.
as the main contractor, consisting of the construction of 1 podium
(4 floors) and 1 tower (31 floors). This building has a building area
of ±35,068.80 m with a building height of 108,65 m. In this Final
Project, the scope of review is floor 1 to floor 12.
The Rawa Buntu Mahata Serpong Tower B2 Construction
Project consists of substructure project, podium structure project,
and typical structure project. The substructure project includes
Raft Foundation and Borepile. The podium and typical structure
projects including the work of columns, beams, plates, and stairs
using the cast in situ casting method. This development project has
a very large volume of work and has a limited time, therefore it is
necessary to calculate the implementation cost and
implementation time in accordance with the implementation
method used based on theory and references from the literature
and linked to the results of field surveys or project analysis. So that
vy using the right implementation method it will create an efficient
and effective cost and time planning. The calculation of
implementation costs begins with calculating the implementation
costs including material prices, worker wages, and equipment
rental. While the calculation of execution time begins with
calculating the volume, productivity, duration, and resources of
each work item. For the preparation of the schedule for each work
item, an assistive application is used, namely Microsoft Project.
As for the presentation of the results of the scheduling using the S
Curve. The final results achieved in this final project include a
recapitulation of the duration of project implementation, project
implementation costs, implementation methods, and the S curve.
From the results of the analysis, it was found that the
implementation duration was 190 days with a total implementation
cost of Rp.23.485.250.770.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Biaya Pelaksanaan, Waktu Pelaksanaan, Metode Pelaksanaan, Microsoft Project, Kurva S.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Muhammad Dzaky Hawari
Date Deposited: 29 Aug 2021 13:02
Last Modified: 29 Aug 2021 13:02
URI: http://repository.its.ac.id/id/eprint/90831