Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Hotel Premier Inn Surabaya Dengan Menggunakan Perth Construction Hire (PCH)

Nabhan, Muchammad Bilal Giri (2022) Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Hotel Premier Inn Surabaya Dengan Menggunakan Perth Construction Hire (PCH). Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710010082-Undergraduate_Thesis.pdf] Text
10111710010082-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2024.

Download (7MB) | Request a copy

Abstract

Pemilihan suatu metode pelaksanaan sangat diperlukan di proyek agar pelaksanaan dapat berjalan sesuai target dari segi mutu, waktu dan biaya. Perencanaan bekisting merupakan bagian penting dalam pelaksanaan struktur beton bertulang, ada beberapa macam metode bekisting. Salah satunya adalah metode bekisting PCH, yang dikembangkan di Australia dan sudah digunakan dibeberapa negara. Dalam penulisan ini mengkaji metode bekisting PCH (Perth Construction Hire) pada Pembangunan Hotel Premier Inn Surabaya, bangunan yang terletak di Surabaya ini memiliki luas ± 1242 m2 dibangun dengan 1 basement dan 9 lantai.
Data yang diperoleh dari proyek ini adalah gambar struktur dan arsitektur dalam bentuk softdrawing. Data diolah untuk dijadikan analisa bentuk, ukuran dan volume. Dari hasil pengolahan data, dapat dibuat perhitungan waktu pelaksanaan dan anggaran biaya pelaksanaan yang dibutuhkan. Untuk hasil akhir adalah penjadwalan yang dilakukan dengan membuat Network Planning dan Kurva S. Adapun alat bantu yang digunakan dalam menyusun penjadwalan proyek ini dengan menggunakan program Microsoft Project. Penjadwalan proyek sangat penting sebagai tolak ukur apakah proyek tersebut selesai sesuai dengan waktu yang telah direncanakan atau lebih dari waktu perencanaan. Adapun hasil dari tugas akhir ini yaitu didapat waktu pengerjaan lantai 2 – 9 menggunakan bekisting PCH yaitu 104 Hari dan 126 Hari untuk bekisting konvensional adapun biaya yang telah dihitung yaitu Rp. 4.210.215.876,70. Sedangkan yang menggunakan metode bekisting konvensional adalah sebesar Rp. 4.449.713.695,72.
================================================================================================
The selection of an implementation method is very necessary in the project so that the implementation can run according to the target in terms of quality, time and cost. Formwork planning is an important part in the implementation of reinforced concrete structures, there are several kinds of formwork methods. One of them is the PCH formwork method, which was developed in Australia and has been used in several countries. In this paper, we examine the PCH (Perth Construction Hire) formwork method in the construction of the Premier Inn Surabaya Hotel, this building located in Surabaya has an area of ± 1242 m2 and was built with 1 basement and 9 floors.
The data obtained from this project are structural and architectural drawings in the form of softdrawing. The data is processed to be used as shape, size and volume analysis. From the results of data processing, it can be calculated that the implementation time and budget for the required implementation costs. The final result is a scheduling that is done by creating a Network Planning and Curve S. The tools used in preparing this project scheduling are using the Microsoft Project program. Project scheduling is very important as a measure of whether the project is completed in accordance with the planned time or more than the planning time. As for the results of this final project, it is obtained that the processing time for floors 2-9 using PCH formwork is 104 days and 120 days for conventional formwork while the calculated cost is Rp. 4.210.215.876,70. While using conventional formwork method is Rp. 4.449.713.695,72.

Item Type: Thesis (Other)
Uncontrolled Keywords: Perth Construction Hire (PCH), implementation time and cost, curve s, scheduling, waktu dan biaya pelaksanaan, kurva s, penjadwalan.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Muchammad Bilal Giri Nabhan
Date Deposited: 19 Feb 2022 05:36
Last Modified: 01 Nov 2022 03:33
URI: http://repository.its.ac.id/id/eprint/94605

Actions (login required)

View Item View Item