Analisis Risiko Kerja Sama Operasi Pada Pelaksanaan Proyek Bendungan Besar (Studi Kasus : Bendungan Tapin)

Pramono, Septian Rizki (2023) Analisis Risiko Kerja Sama Operasi Pada Pelaksanaan Proyek Bendungan Besar (Studi Kasus : Bendungan Tapin). Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111950112007-Master_Thesis.pdf] Text
03111950112007-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (2MB) | Request a copy

Abstract

Proyek Bendungan Tapin adalah salah satu Proyek Strategis Nasional (PSN) yang merupakan salah satu program prioritas Direktorat Jenderal Sumber Daya Air, Kementrian Pekerjaan Umum. Proyek Bendungan ini berlokasi di Kabupaten Tapin, Provinsi Kalimantan Selatan. Proyek ini dilakukan dengan sistem Kerjasama operasi (KSO) antara yaitu BAP dan PT. Waskita Karya (Persero) Tbk. Seiring pelaksanaan pekerjaan proyek dengan sistem Kerjasama operasi (KSO), terdapat risiko yang timbul karena perbedaan visi antar mitra sehingga risiko yang mungkin terjadi perlu diidentifikasi jenis dan sumber penyebabnya, agar dapat dibuat mitigasi risikonya. Penelitian ini bertujuan untuk mengidentifikasi risiko yang timbul pada proyek kerja sama operasi di Bendungan Tapin. Identifikasi risiko KSO dimulai dengan melakukan studi literatur secara mendalam untuk membuat daftar risiko. Survey pendahuluan dan validasi expert dilakukan untuk mengetahui relevansi risiko KSO dengan proyek yang menjadi objek penelitian. Selanjutnya, Probability Impact Matrix (PIM) digunakan untuk melihat risiko dominan yang berpengaruh terhadap tercapainya sasaran proyek. Penelitian ini juga menganalisis alokasi risiko masing masing pihak dan mengusulkan tindakan mitigasi untuk mengurangi peluang dan dampak risiko yang akan ditimbulkan melalui Focus Group Discussion (FGD) dengan peserta yang merupakan expert dari expert judgement yang sesuai dengan tema penelitian. Berdasarkan hasil penelitian diperoleh bahwa pada pembangunan bendungan besar yaitu Bendungan Tapin terindetifikasi 30 (tiga puluh) variabel risiko yang relevan. Risiko-risiko yang terindetifikasi tersebut terdiri dari 4 (empat) risiko finansial dan ekonomi, 3 (tiga) risiko likuiditas, 2 (dua) risiko desain dan konstruksi, 3 (tiga) risiko teknis dan operasional, 2 (dua) risiko sumber daya manusia, 3 (tiga) risiko kebijakan politik dan hukum, dan 13 (tiga belas) risiko pembagian lokasi pekerjaan. Dari hasil identifikasi risiko diperoleh 11 (sebelas) variabel risiko dengan tingkat kategori risiko tinggi yang merupakan risiko dominan (major risk) yang kemudian dialokasikan dan ditentukan rencana mitigasi resikonya. Kategori mitigasi risiko yang digunakan pada penelitian ini yaitu mengurangi risiko, menghindari risiko, dan mengalihkan (transfer) risiko. Hasil penilaian terhadap residual risk menunjukkan bahwa dari 11 resiko yang awalnya berada pada level (tingkat) tinggi, risiko-risiko tersebut mengalami penurunan tingkat risiko setelah adanya mitigasi risiko yaitu 9 risiko turun menjadi level rendah sedangkan 2 risiko turun menjadi level sedang
=======================================================================================================================================
The Tapin Dam Project is one of the National Strategic Projects (PSN), which is one of the priority programs of the Directorate General of Water Resources, Ministry of Public Works. The dam project is located in Tapin Regency, South Kalimantan Province. This project is carried out with a joint operation system (KSO) between BAP and PT. Waskita Karya (Persero) Tbk. Along with the implementation of project work with the Joint Operations (KSO) system, there are risks that arise due to differences in vision between partners so that risks that may occur need to be identified by type and source of causes, so that risk mitigation can be made. This study aims to identify the risks that arise in the joint operation project in Tapin Dam, South Kalimantan. There are many risks that are suspected to have the possibility of hindering the achievement of project performance targets. KSO risk identification begins with conducting an in-depth literature study to list risks. Preliminary surveys and expert validation were conducted to determine the relevance of KSO risk to the project being the object of research. Furthermore, the Probability Impact Matrix (PIM) was used to see the dominant risks that affect the achievement of project goals. This study also analyzes the risk allocation of each party and proposes mitigation actions to reduce the opportunities and impacts of the risks that will arise. Based on the results of the study, it was found that in the construction of a large dam, namely the Tapin Dam, 30 relevant risk variables were identified. The identified risks consist of 4 financial and economic risks, 3 liquidity risks, 2 design and construction risks, 3 technical and operational risks, 2 human resources risks, 3 political and legal policy risks, and 13 job location division risks. From the results of risk identification obtained 11 risk variables with a high risk category level which is the dominant risk (major risk) which is then allocated and a risk mitigation plan is determined. The risk mitigation categories used in this study are reducing risk, avoiding risk, and transferring (transferring) risk. The results of the assessment of residual risk show that of the 11 risks that were initially at a high level, these risks experienced a decrease in the level of risk after risk mitigation, namely 9 risks decreased to a low level while 2 risks decreased to a moderate level

Item Type: Thesis (Masters)
Uncontrolled Keywords: bendungan tapin, kerja sama operasi, risiko, Tapin dam, joint operation, risk
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA660.P55 Underground pipeline design, construction and management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: Septian Rizki Pramono
Date Deposited: 20 Feb 2023 00:56
Last Modified: 20 Feb 2023 00:56
URI: http://repository.its.ac.id/id/eprint/97563

Actions (login required)

View Item View Item