Laporan Kegiatan Magang Proyek Rekonstruksi Terminal Wani Civil Work (CW) Sea Port 2: Works for Reconstruction of Wani Port

Aini, Mufida Nur (2022) Laporan Kegiatan Magang Proyek Rekonstruksi Terminal Wani Civil Work (CW) Sea Port 2: Works for Reconstruction of Wani Port. Project Report. [s.n.], [s.l.]. (Unpublished)

[thumbnail of 03111940000038-Project-Report.pdf] Text
03111940000038-Project-Report.pdf - Accepted Version

Download (27MB)

Abstract

Proyek Rekonstruksi Terminal Wani Civil Work (CW) Sea Port 2: Works for Rconstruction of Wani Port merupakan salah satu proyek rekonstruksi pelabuhan yang berada di Palu, Sulawesi Tengah pasca bencana gempa bumi, tsunami, dan likuifaksi. Penulis mendapatkan kesempatan magang terhitung mulai 1 September 2022 - 31 Desember 2022. Selama proses magang berlangsung penulis mendapat kesempatan untuk mengetahui lingkup pekerjaan yang dilakukan proyek antara lain pekerjaan persiapan, pekerjaan pembongkaran struktur eksisting, pekerjaan rehabilitasi bangunan eksisting, pekerjan pengurugan, timbunan, dan talud, pekerjaan rehabilitasi fasilitas darat, pekerjaan pengamanan dan pemantauan sosial lingkungan (ESMP) selama masa konstruksi. Penulis mendapatkan pengalaman untuk membuat shop drawing, mengerjakan addendum, menghitung pekerjaan untuk progress, melakukan opname pekerjaan aktual, membuat progress mingguan, membuat weekly report, ppt weekly meeting, dan
mounthly report, serta monitoring administrasi engineering.
=========================================================
Civil Work (CW) Sea Port 2: Works for Rconstruction of Wani Port is one of the port reconstruction projects in Palu, Central Sulawesi after the earthquake, tsunami, and liquefaction disaster. During the internship process, the author had the opportunity to find out the scope of work carried out by the project, including preparatory work, demolition work of existing structures, rehabilitation work of existing buildings, construction work, stockpiles, and talud, rehabilitation work of land facilities, security work and social environmental monitoring (ESMP). The author gained experience to make shop drawings, addendums, calculate work for progress, make weekly progress, make weekly reports, ppt weekly meetings, mounthly report, as well as monitoring engineering administration.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Construction, port, project, scope, work, konstruksi, pelabuhan, proyek, ligkup, pekerjaan
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC205 Harbors--Design and construction.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mufida Nur Aini
Date Deposited: 21 Mar 2023 06:54
Last Modified: 21 Mar 2023 06:54
URI: http://repository.its.ac.id/id/eprint/97795

Actions (login required)

View Item View Item