Mawariza, Putri Suci (2021) Evaluasi Risiko Proyek Konstruksi Dengan Metode Fuzzy Serta Hubungannya Terhadap Biaya Kontingensi. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
03111850030003-Master_Thesis.pdf - Accepted Version Download (3MB) |
Abstract
Biaya kontingensi memiliki peranan yang penting pada saat pelaksanaan konstruksi, karena memperkirakan biaya kontingensi proyek secara tepat merupakan salah satu kunci sukses dari manajemen proyek. Penggunaan biaya kontingensi yang kurang tepat dapat menimbulkan berbagai macam permasalahan. Pada penetapan biaya kontingensi praktisi selama ini menggunakan pendekatan yang masih sangat subjektif. Penelitian ini akan membahasa penetapan biaya kontingensi bangunan gedung Pertingkat, berdasarkan hasil dari evaluasi risiko. Evaluasi risiko yang dilakukan adalah pada risiko berdasarkan risiko tahapan pelaksanaan konstruksi proyek gedung bertingkat. Penggunaan fuzzy logic dengan metode weight risk analysis dirasakan merupakan metode yang sangat tepat mengingat banyaknya keunggulan analisa fuzzy logic yang dapat membantu membuat analisa risiko menjadi lebih objektif. Lebih khususnya metode fuzzy digunakan untuk pendekatan analisa level risiko pada proyek yang di tinjau. Sedangkan penggunaan metode weight risk analysis dipilih karena dapat menghasilkan presentase pembobotan yang nantinya dapat di bandingkan dengan data histori biaya kontingensi yang didapatkan melalui sistem pencatatan proyek. Hasil dari penelitian ini menunjukan bahwa hasil evaluasi risiko pada keenam proyek objek penelitian dikelompokan menjadi kelompok tingkat risiko VL (Very Low ) dan L (Low) sesuai dengan derajat keanggotaan fuzzy tiap proyek. Dengan range level risiko sebesar 7.415 sampai dengan 7.652. Semakin besar level risiko maka akan semakin besar pula biaya kontingensi yang di keluarkan oleh proyek, dengan persamaan jika risiko naik sebesar satu satuan, maka jumlah biaya kontingensi akan naik sebesar 0.0916 satuan.
==============================================================================================================================================================================================
Cost contingency have an important role during construction, because accurately estimating project costs contingency is one of the keys to successful project management. Inappropriate use of contingency fees can cause various problems. In determining contingency costs, practitioners have used a very subjective approach. This research will discuss the determination of the contingency cost of high buildings, based on the results of risk grouping analysis based.
The risk evaluation carried out is the risk based on the risk of the project construction implementation. The use of fuzzy logic with the weight risk analysis method is considered to be a very appropriate method considering the many advantages of fuzzy logic analysis that can help make risk analysis more objective. More specifically, the fuzzy method is used for the risk level analysis approach to the project under review. While the use of the weight risk analysis method was chosen because it can produce a percentage which can later be compared with historical contingency cost data obtained through the project recording system. The results of this study indicate that the results of the risk evaluation on the six research object projects are grouped into VL (Very Low) and L (Low) risk levels according to the degree of fuzzy membership of each project. With a risk level range of 7,415 to 7,652. The greater the level of risk, the greater the contingency costs incurred by the project, with the equation if the risk increases by one unit, the total contingency costs will increase by 0.0916 units.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Risiko, Biaya Kontingensi, Risk, Cost Contigency, and Fuzzy logic |
Subjects: | Q Science > QA Mathematics > QA39.3 Fuzzy mathematics T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis |
Depositing User: | - Davi Wah |
Date Deposited: | 17 May 2023 08:29 |
Last Modified: | 19 Mar 2024 09:35 |
URI: | http://repository.its.ac.id/id/eprint/97935 |
Actions (login required)
View Item |