Mahesruri, Alvian Rizki (2022) Laporan magang industri di PT PLN PUSHARLIS (Pusat Pemeliharaan Ketenagalistrikan) UP2W VI. Project Report. [s.n.], [s.l.]. (Unpublished)
Text
10211910000051-Project_Report.pdf - Accepted Version Download (5MB) |
Abstract
Blowing down merupakan salah satu komponen yang melalui proses pengelasan pada PT PLN PUSHARLIS. Dimana hasil dari proses pengelasan akan diperiksa dan ditinjau kembali oleh bagian Quality Control yang bertujuan untuk memastikan bahwa kualitas pengerjaan pengelasan produk tersebut sesuai dengan yang diinginkan menggunakan Penetrant Test. Hasil analisa pengelasan GTAW pada hasil sambungan pengelasan pipa blowdown dengan metode Non-Destructive Test Penetrant Test yang telah dilakukan menyebutkan bahwa telah ditemukan beberapa indikasi kecacatan rounded indication yang mana indikasi yang ditemukan tidak memenuhi acceptance criteria yang mengacu pada ASME Section VIII Divisi 1 yang diterapkan oleh PT PLN PUSHARLIS UP2W VI. Sehingga kecacatan yang ditemukan tersebut harus dilakukan perbaikan atau repair hingga kecacatan tersebut dapat dihilangkan sampai memenuhi acceptance criteria yang ditetapkan. Metode repair yang digunakan yaitu dengan cara grinding dan dilakukan kembali pengelasan pada bagian yang ditemukan indikasi kecacatan tersebut. Dan setelah dilakukan repair maka dilakukan Penetrant Test kembali untuk memastikn bahwa produk telah memenuhi standar yang diterapkan
=====================================================================================================================================
Blowing down is one of the components that goes through a welding process at PT PLN PUSHARLIS. Where the results of the welding process will be checked and reviewed again by the Quality Control section which aims to ensure that the quality of the product's welding work is as desired using the Penetrant Test. The results of the GTAW welding analysis on the results of blowdown pipe welding joints using the Non-Destructive Test Penetrant Test method which have been carried out indicate that several rounded indication defects have been found, in which the indications found do not meet the acceptance criteria referring to ASME Section VIII Division 1 applied by PT PLN PUSHARLIS UP2W VI. So that the defects found must be repaired or repaired until the defects can be eliminated until they meet the established acceptance criteria. The repair method used is by grinding and re-welding the parts where indications of the defect are found. And after the repair is carried out, a Penetrant Test is carried out again to ensure that the product meets the standards applied
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | pengelasan, gtw, piopa |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
Depositing User: | Alvian Rizki Mahesruri |
Date Deposited: | 13 Jul 2023 07:41 |
Last Modified: | 13 Jul 2023 08:54 |