Analisis Percepatan Pekerjaan Pipeline Pada Tahap Perencanaan Proyek Wellhead Platform PT. X Menggunakan Metode Time Cost Trade Off

Akmal, Muhammad Naufal (2023) Analisis Percepatan Pekerjaan Pipeline Pada Tahap Perencanaan Proyek Wellhead Platform PT. X Menggunakan Metode Time Cost Trade Off. Other thesis, Intitut Teknologi Sepuluh Nopember.

[thumbnail of 04311940000094-Undergraduate_Thesis.pdf] Text
04311940000094-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (2MB) | Request a copy

Abstract

Pada proses perencanaan proyek wellhead platform terdapat banyak aktivitas / pekerjaan yang dapat memakan biaya yang sangat besar jika tidak dikelola dengan baik. Karena terdapat hal - hal yang dapat terjadi ketika pengelolaan proyek tidak dilakukan dengan baik, contohnya adalah terjadinya keterlambatan pada aktivitas / pekerjaan proyek yang menyebabkan keterlambatan pada keseluruhan durasi proyek. Maka dari itu penulis melakukan penelitian untuk mencegah keterlambatan dengan melakukan analisis percepatan pada proyek perencanaan wellhead platform dengan menggunakan metode time cost trade off dan dilakukan analisis probabilistik dengan melakukan simulasi monte carlo untuk mendapatkan durasi yang paling memungkinkan untuk proyek dapat diselesaikan. Pada penelitian ini penulis menggunakan 2 alternatif percepatan yaitu Alternatif I penambahan jam kerja 1 jam dan Alternatif II penambahan jam kerja 2 jam. Dari penelitian ini ditemukan bahwa dengan menggunakan Alternatif I yaitu menambahkan jam kerja 1 jam maka durasi yang paling mungkin dapat terjadi berkurang sebanyak 3 hari menjadi 124 hari dengan kenaikan total biaya sebesar Rp 64,702,410 atau sebanyak 6.37% menjadi Rp 1,080,676,616. Sedangkan pada Alternatif II yaitu menambahkan jam kerja 2 jam kerja didapatkan bahwa durasi yang paling mungkin dapat terjadi berkurang 7 hari menjadi 121 hari dengan kenaikan total biaya sebesar Rp 88,218,092 atau sebanyak 8.68% menjadi Rp 1,104,192,299.
===================================================================================================================================
In the process of planning a wellhead platform project, there are many activities/tasks that can incur significant costs if not managed properly. Due to the potential issues that can arise when project management is not carried out effectively, such as delays in project activities/tasks leading to overall project duration delays, the author conducted research to prevent delays by performing acceleration analysis on the wellhead platform planning project using the time-cost trade-off method. Additionally, probabilistic analysis was conducted by performing Monte Carlo simulations to obtain the most probable duration for the project to be completed. In this research, the author utilized two acceleration alternatives: Alternative I, involving the addition of 1 working hour, and Alternative II, involving the addition of 2 working hours. From the study, it was found that by using Alternative I, which adds 1 working hour, the most likely duration that can occur is reduced by 3 days to 124 days, with a total cost increase of Rp 64,702,410 or 6.37%, amounting to Rp 1,080,676,616. On the other hand, Alternative II, which adds 2 working hours, resulted in a reduction of 7 days in the most probable duration to 121 days, with a total cost increase of Rp 88,218,092 or 8.68%, amounting to Rp 1,104,192,299.

Item Type: Thesis (Other)
Uncontrolled Keywords: Analisis Probabilistik, Monte Carlo, Time Cost Trade Off, Probabilistic Analysis
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Muhammad Naufal Akmal
Date Deposited: 20 Jul 2023 03:33
Last Modified: 20 Jul 2023 03:33
URI: http://repository.its.ac.id/id/eprint/98597

Actions (login required)

View Item View Item