Arofah, Rosyida Nofiana and Zaki, Muhammad Abiyyan (2023) Pra Desain Pabrik Tepung Glukomanan dari Chips Porang (Amorphophallus oncophyllus) dengan Metode Kombinasi Purifikasi Mekanis dan Kimiawi Bertingkat dengan Menggunakan Ethanol. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
02211940000033_02211940000177_Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2025. Download (3MB) | Request a copy |
Abstract
Pabrik tepung glukomanan dilakukan melalui proses purifikasi secara mekanis dan kimiawi. Pabrik tepung glukomanan direncanakan untuk berjalan dengan kapasitas 3.000 ton/tahun sepanjang 330 hari per tahun. Bahan baku yang digunakan adalah chips porang. Pabrik ini direncanakan akan dibangun di Kabupaten Madiun, Jawa Timur. Purifikasi mekanis dan kimiawi dilakukan pada suhu 30°C dan pada tekanan 1 atm menggunakan tangki berpengaduk. Dari studi evaluasi ekonomi pabrik ini, didapatkan penaksiran modal (CAPEX) sebesar Rp313.263.377.108; biaya operasional (OPEX) sebesar Rp359.811.485 per ton produk. Berdasarkan analisa ekonomi, dapat disimpulkan bahwa pabrik tepung glukomanan dengan kapasitas 3.000 ton/tahun adalah beresiko rendah dan layak secara ekonomis. Berdasarkan analisa ekonomi terhadap pabrik ini menunjukkan laju pengembalian modal (IRR) didapatkan sebesar 18,8% dengan bunga pinjaman 8% per tahun. Waktu pengembalian modal (POT) selama 3 Tahun. NPV yang didapatkan juga bernilai positif yaitu Rp164.415.903.554. Dari data analisa kelayakan di atas disimpulkan bahwa pabrik ini menguntungkan dan layak untuk didirikan.
================================================================================================================================
Glucomannan flour factory is carried out through a mechanical and chemical purification process. The glucomannan flour factory is planned to operate with a capacity of 3,000 tonnes/year for 330 days per year. This factory is expected to produce glucomannan flour to meet domestic demand. The raw materials used in the manufacture of glucomannan flour factories are porang chips or processed products from porang tubers. This factory is planned to be built in Madiun Regency, East Java, this has been considered through several aspects, one of which is the availability of raw materials Mechanical and chemical purification was carried out at 30°C and at 1 atm pressure using a stirred tank. From this factory economic evaluation study, it was concluded that the estimated capital (CAPEX) was IDR313.263.377.108; operational costs (OPEX) of IDR359.811.485/ton product. Based on the economic analysis, it can be concluded that a glucomannan flour plant with a capacity of 3,000 tons/year is low risk and economically viable. Based on the operating conditions of the raw material and product characteristics, the glucomannan flour factory from porang chips is classified as a low risk factory. Based on the economic analysis of this factory, the rate of return on investment (IRR) was obtained at 18,8% with a loan interest of 8% per year. Payback period (POT) for 3 years. The NPV obtained is also positive, namely IDR164.415.903.554. From the feasibility analysis data above, it is concluded that this factory is profitable and feasible to establish.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | chips porang, kimiawi, mekanis, tepung glukomanan chemical method, glucomannan flour, mechanical method, porang chips |
Subjects: | T Technology > TP Chemical technology > TP155.5 Chemical plants--Design and construction T Technology > TP Chemical technology > TP370 Food processing and manufacture |
Divisions: | Faculty of Industrial Technology and Systems Engineering (INDSYS) > Chemical Engineering > 24201-(S1) Undergraduate Thesis |
Depositing User: | Arofah Rosyida Nofiana |
Date Deposited: | 01 Aug 2023 08:35 |
Last Modified: | 01 Aug 2023 08:35 |
URI: | http://repository.its.ac.id/id/eprint/99906 |
Actions (login required)
View Item |