Perencanaan Alat Berat pada Proyek Jalan Tol Trans Sumatera Ruas Pekanbaru - Padang Seksi Bangkinang - Pangkalan Tahap I

Dhaifullah, Hanif Naufal (2023) Perencanaan Alat Berat pada Proyek Jalan Tol Trans Sumatera Ruas Pekanbaru - Padang Seksi Bangkinang - Pangkalan Tahap I. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111940000133-Undergraduate_Thesis.pdf] Text
03111940000133-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

Proyek Jalan Tol Trans Sumatera Ruas Pekanbaru – Padang Seksi Bangkinang – Pangkalan Tahap I pada STA 57+350 sampai dengan STA 58+350 akan melaksanakan pekerjaan cut and fill dengan volume yang relatif besar. Pada pekerjaan cut and fill diperlukan bantuan alat berat dalam pelaksanaannya. Dikarenakan banyaknya jumlah dan berbagai jenis alat berat yang dibutuhkan, perencanaan perlu dilakukan terhadap alat berat yang akan digunakan. Tugas akhir ini bertujuan untuk merencanakan kombinasi alat berat yang digunakan dalam pekerjaan cut and fill yang sesuai dengan kondisi lapangan dan menentukan berapa biaya yang diperlukan untuk penggunaan alat berat. 2 metode konstruksi yang direncanakan akan dibandingkan dari sisi biaya dan waktu. Aspek biaya akan mempertimbangkan biaya operasional alat berat, sedangkan aspek waktu menganalisis urutan pekerjaan dan durasi yang diperlukan. Total biaya operasional dari kedua metode akan dibandingkan dan dipilih metode dengan biaya operasional yang lebih kecil. Pada proyek ini didapati bahwa pekerjaan cut and fill dapat dikerjakan oleh kombinasi alat berat excavator PC 300, dump truck FN 527 ML, bulldozer D39 PX-22, motor grader GD 511, sheep foot roller SV 400 T, dan vibrating compactor SV 400 TF. Metode konstruksi 1 selesai 1 hari lebih cepat dibandingkan metode konstruksi 2. Metode konstruksi 1 memerlukan biaya operasional sebesar Rp. 3.549.565.487,50 dan metode konstruksi 2 memerlukan biaya operasional sebesar Rp. 3.541.790.550,00. Metode konstruksi kedua dipilih karena memiliki biaya operasional yang lebih rendah.
====================================================================================================================================
The Trans Sumatra Toll Road Project Section Pekanbaru – Padang Bangkinang Section – Pangkalan Phase I at STA 57+350 to STA 58+350 has a cut and fill work in a large volume. For cut and fill work, heavy equipment is required for its implementation. Due to the large number and various types of heavy equipment needed, planning needs to be done for the heavy equipment to be used. This final project aims to plan a combination of heavy equipment used in cut and fill work according to field conditions and determine how much money is required for the use of heavy equipment. The 2 planned construction methods will be compared in terms of cost and time. The cost aspect will consider the operating costs of heavy equipment, while the time aspect will analyze the sequence of work and the required duration. The total operating costs of the two methods will be compared and the method with the smaller operating costs will be selected. In this project it was found that cut and fill work could be done by a combination of PC 300 excavators, FN 527 ML dump trucks, D39 PX-22 bulldozers, GD 511 motor graders, SV 400 T sheep foot rollers, and SV 400 TF vibrating compactors. Construction method 1 was completed 1 day faster than construction method 2. Construction method 1 requires an operational cost of Rp. 3,549,565,487.50 and construction
method 2 requires an operational cost of Rp. 3,541,790,550.00. The second construction method was chosen because it has lower operating costs.

Item Type: Thesis (Other)
Uncontrolled Keywords: Alat Berat, Biaya, Cut and Fill, Jalan Tol Trans Sumatera, Cost, Cut and Fill, Heavy Equipment, Productivity, Trans Sumatera Toll Road
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Hanif Naufal Dhaifullah
Date Deposited: 28 Jul 2023 07:37
Last Modified: 28 Jul 2023 07:37
URI: http://repository.its.ac.id/id/eprint/100887