Analisis Risiko Keselamatan dan Kesehatan Kerja (K3) Menggunakan Metode Modified House of Risk (HOR) (Studi Kasus: Kilang Minyak PT X)

Hidayat, Achmad Rafiqirazaq (2023) Analisis Risiko Keselamatan dan Kesehatan Kerja (K3) Menggunakan Metode Modified House of Risk (HOR) (Studi Kasus: Kilang Minyak PT X). Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02411940000097-Undergraduate_Thesis.pdf] Text
02411940000097-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (3MB) | Request a copy

Abstract

Setiap tahun angka kecelakaan kerja semakin meningkat. 85% kecelakaan kerja terjadi disebabkan oleh faktor kelalaian atau kesalahan manusia. Kesalahan dapat muncul dari ketidakpastian yang terjadi di masa depan. Kurangnya input data yang relevan atau pengetahuan yang cukup bisa menjadi faktor ketidakpastian dalam penilaian risiko kerja. Ketidakpastian tersebut dapat menimbulkan suatu risiko dalam waktu cepat atau lambat. Hal ini yang membuat perusahaan ingin mengedepankan aspek Keselamatan Dan Kesehatan Kerja (K3) di lingkungan kerja perusahaan. Usia kilang yang tidak lagi muda juga menjadi salah satu faktornya. Oleh karena itu, penelitian ini dilakukan dengan tujuan untuk melakukan analisis risiko K3 pada proses operasional perusahaan dengan menggunakan metode modified House of Risk (HOR). HOR terdiri dari 2 fase, yaitu HOR fase 1 yang digunakan untuk mengidentifikasi kejadian risiko (Risk Event) dan agen risiko (Risk Agent) yang dapat terjadi pada proses operasional perusahaan dan HOR fase 2 yang digunakan untuk mengidentifikasi alternatif strategi mitigasi risiko terhadap agen risiko yang telah diidentifikasi dan memprioritaskan tindakan pencegahan atau prevention action yang harus dilakukan terlebih dahulu. Pada model HOR fase 1, terdapat modifikasi yang dilakukan pada pemetaan proses operasional perusahaan, yaitu dengan menggunakan model Software-Hardware-Environment-Liveware (SHELL) untuk menggambarkan interaksi antar komponen. Sedangkan, modifikasi yang dilakukan pada model HOR fase 2 adalah tindakan pencegahan untuk setiap penyebab risiko ditentukan berdasarkan pada hierarki pengendalian risiko K3, yaitu eliminasi, subtitusi, engineering control, administrasi, dan APD. Berdasarkan hasil identifikasi dan pengolahan data pada HOR fase 1, didapatkan 61 kejadian risiko dan 25 agen risiko yang terjadi di proses operasional perusahaan. Pada HOR fase 2, terdapat 8 strategi mitigasi risiko atau prevention action yang dirancang untuk menangani 9 agen risiko yang diprioritaskan dengan menggunakan konsep pareto 80:20.
=================================================================================================================================
Every year the number of work accidents is increasing. 85% of work accidents occur due to negligence or human error. Errors can arise from uncertainties that occur in the future. Lack of relevant data input or sufficient knowledge can be a factor of uncertainty in occupational risk assessment. Such uncertainty can lead to a risk sooner or later. This is why Company wants to prioritize Occupational Safety and Health (OHS) aspects in the company's work environment. The age of oil refinery which is no longer young is also one of the factors. Therefore, this research was conducted with the aim of analyzing OHS risks in the operational process of oil refinery using the modified House of Risk (HOR) method. HOR consists of 2 phases, namely HOR phase 1 which is used to identify Risk Events and Risk Agents that can occur in the company's operational processes and HOR phase 2 which is used to identify alternative risk mitigation strategies for the identified Risk Agents and prioritize prevention actions that must be taken first. In the HOR phase 1, there are modifications made to the company's operational process mapping by using the Software-Hardware-Environment-Liveware (SHELL) model to describe interactions between components. Meanwhile, the modification made to the HOR phase 2 is the preventive measures for each risk cause are determined based on the OHS risk control hierarchy, namely elimination, substitution, engineering control, administration, and PPE. Based on the results of data identification and processing in HOR phase 1, 61 Risk Events and 25 Risk Agents were obtained that occurred in the company's operational processes. In HOR phase 2, there are 8 risk mitigation strategies or prevention actions designed to handle 9 prioritized Risk Agents using the 80:20 pareto concept.

Item Type: Thesis (Other)
Uncontrolled Keywords: K3, House of Risk, Risk Event, Mitigasi, OHS, Mitigation
Subjects: T Technology > T Technology (General) > T174.5 Technology--Risk assessment.
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Achmad Rafiqirazaq Hidayat
Date Deposited: 06 Sep 2023 08:03
Last Modified: 06 Sep 2023 08:03
URI: http://repository.its.ac.id/id/eprint/102756

Actions (login required)

View Item View Item