Penerapan Metode Building Information Modeling (Bim) Untuk Estimasi Biaya Dan Analisa Jadwal Pekerjaan Pada Studi Kasus Proyek Pembangunan Gedung Pw NU Surabaya 17 Lantai

Budiarto, Zendy Eko (2023) Penerapan Metode Building Information Modeling (Bim) Untuk Estimasi Biaya Dan Analisa Jadwal Pekerjaan Pada Studi Kasus Proyek Pembangunan Gedung Pw NU Surabaya 17 Lantai. Other thesis, Institut Tegnologi Sepuluh Nopember.

[thumbnail of 10111910010040-Undergraduate_Theses For Diploma.pdf] Text
10111910010040-Undergraduate_Theses For Diploma.pdf - Accepted Version
Restricted to Repository staff only until 1 September 2025.

Download (10MB) | Request a copy

Abstract

Pelaksanaan konstruksi di Indonesia saat ini masih banyak perusahaan konstruksi yang masih memakai software konvensional seperti Autocad untuk desain gambar, Microsoft Excel untuk perhitungan volume dan biaya, serta Microsoft Project untuk penjadwalan. Dengan masih digunakannya metode konvensional pada penerapan konstruksi di Indonesia, masih banyak permasalahan yang sering terjadi pada pelaksanaannya. Dalam BIM, para stakeholder (owner, arsitek, kontraktor, engineer) saling bekerjasama, secara efisien bertukar informasi (baik data maupun geometri), berkolaborasi dalam mengefisienkan proses pembangunan/konstruksi sehingga dapat memperkecil kesalahan dan mempercepat proses konstruksi, menghasilkan pengoperasian bangunan yang lebih mudah, meminimalisir produksi limbah sekaligus mengeluarkan biaya yang lebih murah. Pada penelitian ini bertujuan untuk mengetahui hasil dari perbandingan estimasi biaya dan analisa jadwal pekerjaan yang menggunakan konsep Building Information Modeling (BIM) dengan metode konvensional pada proyek pembangunan gedung PW NU Surabaya. Penelitian ini menghasilkan kesimpulan bahwa penggunaan Building Information Modeling (BIM) sangat menguntungkan karena permodelan 3D mampu memberikan output material takeoff yang lebih terperinci, mendukung 4D dalam hal pengestimasian durasi, serta mendukung 5D dalam hal pengestimasian biaya. Penggunaan metode Building Information Modeling (BIM) dengan metode konvensional menghasilkan selisih biaya sebesar Rp. 6.940.436.339 yang berarti 8,93% lebih murah dibandingkan dengan perhitungan rencana anggaran biaya dengan metode konvensional dan hasil analisa jadwal dengan menggunakan metode Building Information Modeling (BIM) menghasilkan jumlah durasi yang lebih sedikit yaitu 459 hari dimana terjadi selisih 31 hari dari metode konvensional ================================================================================================================================
Construction implementation in Indonesia currently there are still many construction companies that still use conventional software such as Autocad for drawing design, Microsoft Excel for volume and cost calculations, and Microsoft Project for scheduling. With the use of conventional methods in the application of construction in Indonesia, there are still many problems that often occur in its implementation. In BIM, stakeholders (owners, architects, contractors, engineers) work together, efficiently exchange information (both data and geometry), collaborate in streamlining the construction / construction process so that it can minimize errors and speed up the construction process, produce easier building operations, minimize waste production while incurring cheaper costs. This study aims to determine the results of a comparison of cost estimates and analysis of work schedules using the concept of Building Information Modeling (BIM) with conventional methods in the PW NU Surabaya building construction project. This study concluded that the use of Building Information Modeling (BIM) is very beneficial because 3D modeling can provide more detailed takeoff material output, support 4D in terms of duration estimation, and support 5D in terms of cost estimation. The use of the Building Information Modeling (BIM) method with conventional methods results in a cost difference of Rp. 6.940.436.339 which means 8.93% cheaper than the calculation of budget plans with conventional methods and the results of schedule analysis using the Building Information

Item Type: Thesis (Other)
Uncontrolled Keywords: BIM, Cost Estimation, Time Scheduling
Subjects: T Technology > TH Building construction > TH438.13 Building information modeling.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Zendy Eko Budiarto
Date Deposited: 27 Sep 2023 06:21
Last Modified: 27 Sep 2023 06:21
URI: http://repository.its.ac.id/id/eprint/103258

Actions (login required)

View Item View Item