Analisis Gerusan Pada Hilir Kolam Olak Bendungan Bagong Kabupaten Trenggalek

Dewi, Elsa Zahra Permata (2023) Analisis Gerusan Pada Hilir Kolam Olak Bendungan Bagong Kabupaten Trenggalek. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910020018-Undergraduate_Thesis.pdf] Text
10111910020018-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 September 2025.

Download (15MB) | Request a copy

Abstract

Bangunan pelimpah memiliki fungsi untuk mengalirakan kelebihan air atau debit banjir di dalam bendungan menuju kembali ke sungai. Aliran yang cepat dari puncak bangunan pelimpah (mercu) dapat menimbulkan endapan dan gerusan yang dapat merusak struktur dari bendungan. Gerusan adalah proses semakin dalamnya dasar sungai (erosi) yang diakibatkan adanya interaksi antara aliran dengan material dasar sungai (sedimen). Salah satu cara untuk dapat mengurangi risiko tersebut adalah dengan membangun peredam energi di ujung hilir bangunan pelimpah agar loncatan hidrolik yang terjadi tidak menyebabkan gerusan. Oleh sebab itu, loncatan hidrolik yang terjadi pada peredam energi perlu diperhatikan apakah hal tersebut dapat menyebabkan gerusan atau tidak pada bagian hilir kolam olak (sungai). Analisa gerusan yang dilakukan pada proyek akhir ini menggunakan perhitungan manual dan simulasi aplikasi HEC-RAS dengan kala ulang 50 tahun sampai PMF. Dari hasil analisis yang diperoleh melalui perhitungan manual, terdapat dua persamaan yang digunakan. Berdasarkan dari hasil persamaan Lacey, didapatkan kedalaman gerusan yang terjadi sebesar 1 – 2 m. Sedangkan untuk perhitungan Wu, didapatkan nilai sebesar 1 – 3 m. Perbedaan hasil yang terdapat diantara kedua persamaan disebabkan oleh faktor varibel yang digunakan. Berdasarkan hasil simulasi pemodelan 2D sedimen pada aplikasi HEC-RAS, diperoleh jika kedalaman gerusan yang terjadi pada kondisi eksisting (kolam olak USBR tipe III) sebesar 0 – 0.18 m. Selain itu, dari hasil simulasi pada beberapa alternatif desain yang menggunakan beberapa tipe kolam olak yang ada pada USBR, didapatkan jika kondisi eksisting dengan proteksi bronjong dapat mengurangi gerusan yang terjadi pada bagian tipe sungai di sekitar area hilir kolam olak.
=====================================================================================================================================
The spillway has a function to divert excess water or flood discharge inside the dam back to the river. Rapid flow from the top of the spillway (lighthouse) can cause sediment and scour that can damage the structure of the dam. Scour is the process of deepening the riverbed (erosion) caused by the interaction between the flow and the riverbed material (sediment). One way to be able to reduce the risk is to build an energy reducer at the downstream end of the spillway building so that the hydraulic jump that occurs does not cause scour. Therefore, the hydraulic jump that occurs in the energy reducer needs to be considered whether it can cause scour or not in the downstream of the swift pond (river). The scour analysis carried out in this final project uses manual calculations and simulations of the HEC-RAS application with a return period of 50 years to PMF.
From the analysis results obtained through manual calculations, there are two equations used. Based on the results of the Lacey equation, it is found that the scour depth that occurs is 1 - 2 m. As for Wu's calculation, a value of 1 - 3 m was obtained. The difference in results between the two equations is due to the variable factors used. Based on the results of 2D sediment modeling simulations in the HEC-RAS application, it is found that the depth of scour that occurs in existing conditions (USBR type III olak pond) is 0 - 0.18 m. In addition, from the simulation results of several simulations, it is found that the depth of scour is 0 - 0.18 m. In addition, from the simulation results on several design alternatives that use several types of existing swale pools at USBR, it is found that the existing conditions with gabion protection can reduce the scour that occurs in the river type section around the downstream area of the swale pool.

Item Type: Thesis (Other)
Uncontrolled Keywords: Bendungan, Bangunan Pelimpah (Spillway), Gerusan Lokal, Kolam Olak USBR, Dams, Spillways, Local Scour, USBR Stilling Basin
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Elsa Zahra Permata Dewi
Date Deposited: 15 Aug 2023 07:11
Last Modified: 15 Aug 2023 07:11
URI: http://repository.its.ac.id/id/eprint/103927

Actions (login required)

View Item View Item