Manajemen Pelaksanaan Pada Pekerjaan Main Dam Paket 1, Bendungan Jragung Kab. Semarang

Ananto Putera, Alifani Bima (2023) Manajemen Pelaksanaan Pada Pekerjaan Main Dam Paket 1, Bendungan Jragung Kab. Semarang. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910020067_Undergraduate_Thesis.pdf] Text
10111910020067_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (28MB) | Request a copy

Abstract

Alat berat memegang peranan penting dalam proyek konstruksi, terutama proyek konstruksi besar. Pekerjaan di bidang ini membutuhkan alat berat, sehingga lebih mudah untuk mencapai hasil yang diharapkan. Memilih alat yang salah dapat menghabiskan waktu dan biaya yang dikeluarkan terbuang dengan percuma. Alat berat yang digunakan dalam tugas akhir ini berjalan beriringan dengan pekerjaan tanah. Pekerjaan ini sangat penting dan dalam beberapa kasus merupakan bagian besar dari pekerjaan dalam keseluruhan proses pembangunan. Kajian ini dilakukan untuk mendapatkan penggunaan alat berat yang efektif dalam pekerjaan tanah, meliputi analisa produktifitas alat berat, jumlah , dan waktu pekerjaan yang optimal, serta biaya yang dibutuhkan dalam penggunaan alat berat. Dimulai dengan menganalisa perhitungan produktivitas alat berat pada masing-masing pekerjaan, menghitung kebutuhan alat berat, kebutuhan sumber daya manusia, menghitung biaya (penggunaan alat berat, sumber daya manusia, material), menghitung durasi pekerjaan. Setelah itu akan dilakukan analisa penjadwalan yang bertujuan untuk mengoptimalisasikan khususnya penggunan alat berat dalam setiap pekerjaan. Dari hasil analisa yang dilakukan, didapatkan bahwa metode pelaksanaan yang digunakan adalah penimbunan yang bertahap pada pekerjaan timbunan tubuh bendungan. Total biaya yang dihasilkan dari seluruh pekerjaan adalah Rp438.392.338.780 dengan total waktu penyelesaian selama 379 hari kalender pada pekerjaan persiapan dan 665 hari kalender pada pekerjaan timbunan tubuh bendungan.
===============================================================================================================================
Heavy equipment plays an important role in construction projects, especially large construction projects. Work in this area requires heavy equipment, so it is easier to achieve the expected result. Choosing the wrong tool can cost you time and money to waste. The heavy equipment used in this final project goes hand in hand with the earthworks. This work is very important and in some cases a large part of the work in the whole development process. This study was conducted to obtain effective use of heavy equipment in earthworks, including analysis of heavy equipment productivity, optimal amount and time of work, as well as the costs required in using heavy equipment. Starting with analyzing the calculation of heavy equipment productivity on each job, calculating heavy equipment needs, human resource needs, calculating costs (heavy equipment use, human resources, materials), calculating the duration of work. After that, a scheduling analysis will be carried out aimed at optimizing especially the use of heavy equipment in each job. From the results of the analysis carried out, it was found that the implementation method used was a gradual stockpiling of the dam body work. The total cost generated from the entire work was Rp438,392,338,780 with a total completion time of 379 calendar days on preparatory work and 665 calendar days on dam body backfill work.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Alat Berat, Bendungan Utama, Produktifitas, Penjadwalan, Heavy Equipment, Main Dam, Productivity, Scheduling
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA455.S6 Soil (Materials of engineering and construction)
T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Alifani Bima Ananto Putera
Date Deposited: 05 Sep 2023 04:00
Last Modified: 05 Sep 2023 04:00
URI: http://repository.its.ac.id/id/eprint/104745

Actions (login required)