MUSLIMIN, AMIRUL (2016) USULAN PENERAPAN KONSEP GREEN ROAD UNTUK JALAN MENUJU BANDAR UDARA BLIMBINGSARI KABUPATEN BANYUWANGI. Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3114207809-Master_Theses.pdf - Published Version Download (6MB) | Preview |
Preview |
Text
3114207809-Conclusion.pdf - Published Version Download (35kB) | Preview |
Abstract
Green Road adalah suatu konsep pembangunan berkelanjutan sebuah jalan yang menerapkan prinsip ramah lingkungan (ecologically sustainable), berkeadilan social (socially equitable), dan efisien secara ekonomi (economically efficient), dimulai dari tahap pembiayaan, perencanaan, desain, konstruksi, dan pemeliharaan jalan, serta penanganan dampak perubahan iklim. Pemerintah Kabupaten Banyuwangi adalah salah satu kabupaten yang belum pernah melakukan pembangunan jalan green road, karena belum pernah menyusun konsepnya.
Seiring hal tersebut, perlu upaya implementasi titik temu antara konsep green road dengan spesifikasi umum yang sesuai kultur sosial, budaya, geografis, serta kapasitas kemampuan APBD Pemerintah Daerah Kabupaten Banyuwangi, dan yang bisa dijadikan usulan penerapan konsep green road untuk jalan menuju Bandar Udara Blimbingsari Kabupaten Banyuwangi.
Metode penelitian untuk usulan penerapan konsep green road ini, dilakukan dengan alat analisis Analytical Hierarchy Process (AHP) untuk menentukan tahapan prioritas kegiatan kerja, dan dengan menggunakan analisis Regresi Linear serta analisis Future Value (FV) untuk menyusun estimasi besarnya anggaran dan masa waktu kegiatan kerja pembangunannya.
Penelitian yang telah dilakukan menyimpulkan hasil, bahwa tahapan urutan prioritas kegiatan kerjanya adalah : 1) Pengadaan Lahan untuk Jalan Green Road ; 2)Pembangunan Badan Jalan Green Road ; 3) Pemasangan Rambu-Rambu dan Marka Jalan ; 4) Pembangunan Drainase dan Resapan Air ; 5) Pemasangan Lampu Penerangan Jalan Umum (LPJU) ; 6 )Pembangunan Trotoar / Jalur Pejalan Kaki ; 7) Pembangunan Jalur bagi Pesepeda ; 8) Penanaman Pohon di sepanjang Trotoar dan Jalur Pesepeda, serta Ruang Terbuka Hijau ; 9) Penanaman Rumput Vetiver sebagai Penahan Tanah dari Longsor ; 10) Pembangunan fasilitas tempat duduk bagi pejalan kaki ; 11) Pembangunan Kolam Penampungan Air ; 12) Pembangunan Instalasi Mitigasi Kebisingan ; 13) Pembangunan Area Parkir Pesepeda, dan prediksi masa waktu pembangunan jalan green road akses bandar udara Blimbingsari adalah 5 (lima) tahun, dimulai dari tahun 2017 sampai 2021, dengan penghematan sebesar Rp. 11.183.582.213,-.===== Green Road is a concept of sustainable development a way that applies the principle of ecologically sustainable, socially equitable, and economically efficient, starting from the stage of the financing, planning, design, construction, and maintenance of roads, as well as the impact of climate change. Banyuwangi regency government is one of the districts that have never done a green road construction road, having never compose concept.
As it is, it is necessary efforts to implement the links between the concept of green road with the general specifications corresponding social culture, cultural, geographic, and capacity capabilities Budgets Local Government Banyuwangi, and which can be used as the proposed implementation of the concept of green road for the road to the airport Blimbingsari District Banyuwangi.
The research method to the proposed implementation of the concept of green road, conducted with analytical tools Analytical Hierarchy Process (AHP) to determine the stage of priority work activities, and by using analysis of linear regression and analysis of Future Value (FV) to draw up estimates of the size of the budget and time period work activities development.
Research has been done concludes that stages its order of priority activities are: 1) Land Acquisition for Road Green Road; 2) Development Agency Green Street Road; 3) Installation of signs-signs and Marka Street; 4) Construction of Drainage and Watershed; 5) Installation of street lighting lamps (LPJU); 6) Construction of Sidewalks/Pedestrian; 7) Development Paths for cyclists; 8) Planting trees along the Sidewalks and Trails Cyclists and Green Open Space; 9) Planting Vetiver Grass as Soil Retention of landslide; 10) Construction of seating facilities for pedestrians; 11) Construction of Swimming Shelter Water; 12) Installation Construction Noise Mitigation; 13) Cyclists Parking Area Development, and the prediction of future road construction time green airport access road Blimbingsari is 5 (five) years, starting from 2017 until 2021, with savings of Rp. 11.183.582.213,-.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | konsep, green road, pembangunan berkelanjutan, akses bandar udara Blimbingsari, concept, green road, sustainable development, access to airports Blimbingsari |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TE Highway engineering. Roads and pavements |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis |
Depositing User: | AMIRUL MUSLIMIN - |
Date Deposited: | 28 Dec 2016 08:27 |
Last Modified: | 27 Dec 2018 02:45 |
URI: | http://repository.its.ac.id/id/eprint/1052 |
Actions (login required)
View Item |