Studi Koordinasi Proteksi Pada PT.PLTU Tanjung Jati B Unit 3 dan Unit 4

Aji, Rayhan Prabowo (2024) Studi Koordinasi Proteksi Pada PT.PLTU Tanjung Jati B Unit 3 dan Unit 4. Masters thesis, Insititut Teknologi Sepuluh Nopember.

[thumbnail of 07111940000194-Undergraduate_Thesis.pdf] Text
07111940000194-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (2MB) | Request a copy

Abstract

PT PLTU TANJUNG JATI B merupakan salah satu pembangkit terbesar dengan kapasitas 2x600MW dan tersambung dengan saluran transmisi 500kV, pembangkit ini berbahan bakar batubara. Total kapasitas saat ini menyumbang sekitar 12% dari total kebutuhan listrik Jawa – Bali. Dengan kapasitas yang besar maka diperlukan koordinasi sistem proteksi untuk menjaga keamanan dari gangguan pada saat proses produksi. Sistem proteksi yang baik juga berguna untuk melindungi peralatan dari kerusakan dan diharapkan juga bisa menajaga agar tidak mengalami gangguan hubung singkat antar fasa maupun fasa ketanah, Peralatan proteksi diharapkan dapat bekerja dengan cepat, sensitif, handal, dan selektif dalam menangani berbagai gangguan yang terjadi. Koordinasi sistem proteksi diperlukan untuk mengamankan dari gangguan hubung singkat, sistem proteksi yang digunakan untuk melindungi peralatan adalah OCR (Over Current Rela), rele-rele ini akan berkoordinasi apabila terjadi gangguan hubung singkat, dan lonjakan arus terlampau besar. Untuk meningkatkan performa dari sistem proteksi pada PT. PLTU TANJUNG JATI B khususnya pada unit 3 dan unit 4. Untuk meningkatkan performa dari sistem proteksi perlu dilakukan analisa terhadap setting dan koordinasi rele proteksi yang ada seperti rele arus lebih. Analisa ini dapat dilakukan dengan menggambarkan kurva karakteristik rele arus lebih (overcurrent relay). Sebelum melakukan setting arus beban penuh, arus hubung singkat, dan setting waktu dari rele arus lebih maka perlu dilakukan perhitungan. Adapun Hasil yang didapat pada penelitian tugas akhir ini adalah setting relay Air Compressor A dengan nilai pickup yang sebelumnya 2,1 menjadi 2,25 kemudian diperoleh time dial sebesar 0,3,dan pickup instantaneous sebesar 5,00
=================================================================================================================================
PLTU TANJUNG JATI B is one of the largest generators with a capacity of 2x600MW and connected to a 500kV transmission line, this generator is coal-fired. The total capacity currently contributes around 12% of the total electricity needs of Java - Bali. With a large capacity, coordination of the protection system is required to maintain security from disturbances during the production process. A good protection system is also useful for protecting equipment from damage and is also expected to be able to prevent short circuits between phases or ground phases. Protection equipment is expected to work quickly, sensitively, reliably and selectively in handling various disturbances that occur. Protection system coordination is needed to protect against short circuit disturbances, the protection system used to protect equipment is OCR (Over Current Rela), these relays will coordinate if a short circuit fault occurs and the current surge is too large. To improve the performance of the protection system at PT. PLTU TANJUNG JATI B, especially in units 3 and 4. To improve the performance of the protection system, it is necessary to analyze the settings and coordination of existing protection relays such as overcurrent relays. This analysis can be carried out by describing the overcurrent relay characteristic curve. Before setting the full load current, short circuit current, and setting the time of the overcurrent relay, calculations need to be made. The results obtained in this final research project are setting the Air Compressor A relay with a pickup value from 2.1 to 2.25, then a time dial of 0.3, and an instantaneous pickup of 5.00.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Proteksi, Sistem, Over Current , Hubung Singkat, Rele
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK153 Electric power factor. Lightning protection.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3030 Electric power distribution systems
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Rayhan Prabowo Aji
Date Deposited: 05 Feb 2024 06:15
Last Modified: 05 Feb 2024 06:15
URI: http://repository.its.ac.id/id/eprint/106089