Analisis Reliabilitas Mesin Spot Welding Pada Proses Pengelasan Carbody Kereta Api Di PT INKA (Persero)

Widayati, Melyana Eka Putri (2023) Analisis Reliabilitas Mesin Spot Welding Pada Proses Pengelasan Carbody Kereta Api Di PT INKA (Persero). Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2043201022_Undergraduate_Thesis.pdf] Text
2043201022_Undergraduate_Thesis.pdf
Restricted to Repository staff only until 1 April 2026.

Download (1MB) | Request a copy

Abstract

Transportasi merupakan salah satu bidang industri yang menjadi kontributor dari peningkatan pertumbuhan industri manufaktur di Indonesia pada tahun 2023. PT INKA (Persero) Madiun merupakan salah satu entitas industri transportasi yang berfokus pada produksi kereta api. Produksi kereta tidak terbatas pada pasar domestik, tetapi juga mencakup pasar global. Oleh karena itu, perusahaan harus memiliki strategi produksi yang efisien, termasuk perawatan mesin yang teratur untuk mencegah gangguan dalam produksi. Perusahaan menerapkan strategi preventive maintenance pada mesin produksi yang dianggap penting, yaitu mesin spot welding 103 dan mesin spot welding 108. Penelitian ini menggunakan metode proses geometrik yang bertujuan untuk menentukan waktu dan biaya optimum preventive maintenance pada mesin. Hasil penelitian ini menunjukkan bahwa waktu optimum pemeliharaan untuk setiap mesin yaitu mesin spot welding 103 adalah setelah kerusakan ke-19 yaitu pada bulan ke-11 atau hari ke-330 dengan estimasi biaya Rp 1,498,000.00 dan untuk mesin spot welding 108 adalah setelah kerusakan ke-23 yaitu pada bulan ke-11.6 atau hari ke-349 dengan estimasi biaya Rp 2,199,000.00 =================================================================================================================================
Transportation is one of the industrial fields that is a contributor to the increasing growth of the manufacturing industry in Indonesia in the first quarter of 2023. PT INKA (Persero) Madiun is one of the transportation industry entities that focuses on railway production. Train production is not limited to the domestic market, but also includes the global market. Therefore, the company must have an efficient production strategy, including regular maintenance of machines to prevent interruptions in production. The Company implements preventive maintenance strategies on production machines that are considered important, namely spot welding machine 103 and spot welding machine 108 . This study uses a geometric process method that aims to determine the optimum time and cost of preventive maintenance on the machine. The results of this study show that the optimum maintenance time for each machine, namely the 103rd spot welding machine, is after the 19th damage, which is in the 11th month or 330 days with an estimated cost of Rp 1,498,000.00 and for the 108 spot welding machine is after the 23th damage, which is in the 11.6th month or 349 days with an estimated cost of Rp 2,199,000.00.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Preventive Maintenance, Proses Geometrik, Spot Welding, Geometric Process
Subjects: Q Science
Q Science > Q Science (General)
Q Science > QA Mathematics > QA274.2 Stochastic analysis
Divisions: Faculty of Vocational > 49501-Business Statistics
Depositing User: Melyana Eka Putri Widayati
Date Deposited: 07 Feb 2024 07:35
Last Modified: 07 Feb 2024 07:35
URI: http://repository.its.ac.id/id/eprint/106414

Actions (login required)

View Item View Item