Analisis Percepatan Durasi Instalasi Offshore Pipeline pada Perairan Terang Sirasun Batur Field

Hikmahwan, Muhammad Aswan (2022) Analisis Percepatan Durasi Instalasi Offshore Pipeline pada Perairan Terang Sirasun Batur Field. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04311840000096-Undergraduate_Thesis.pdf] Text
04311840000096-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2024.

Download (4MB) | Request a copy

Abstract

Sebuah proyek merupakan kegiatan yang dilakukan secara terkonsep untuk mencapai tujuan tertentu dengan menggunakan anggaran biaya serta sumber daya yang ada. Salah satunya proyek instalasi offshore pipeline yang memerlukan perencanaan dengan benar. Ketidaksesuaian pada proses di jadwal dengan keadaan yang sebenarnya dapat menimbulkan masalah. Keterlambatan proyek konstruksi bisa saja disebabkan masalah dalam melakukan estimasi waktu yang dibutuhkan misalnya, disebabkan oleh manajemen yang tidak tepat. Ketepatan penggunaan waktu adalah tolok ukur kesuksesan sebuah proyek sehingga ketepatan penggunaan waktu tercapai jika proyek selesai sesuai rencana atau lebih cepat dari rencana. Maka dari itu percepatan diperlukan dalam hal tersebut. Tugas Akhir ini membahas tentang percepatan durasi pada proyek dengan metode Crash Program dengan 2 alternatif yaitu penambahan jam kerja/lembur dan penambahan tenaga kerja/2 shift, dengan tujuan mendapatkan hasil durasi optimal dalam berjalannya suatu proyek. Hasil dari analisis Tugas Akhir ini adalah, melalui penambahan jam kerja, didapatkan durasi optimal selama 76 hari dengan biaya total sebesar Rp. 387.736.227.438, sedangkan melalui penambahan tenaga kerja/2 shift, didapatkan durasi optimal selama 72 hari dengan biaya total sebesar Rp. 377.608.016.031.
===================================================================================================================================
A project is an activity that is conceptually carried out to achieve certain goals using the budget and existing resources. One of them is an offshore pipeline installation project that requires proper planning. The discrepancy in the schedule process with the actual situation can cause problems. Construction project delays can be caused by problems in estimating the time required, for example, due to improper management. Timeliness is a measure of the success of a project so that timeliness is achieved if the project is completed according to plan or sooner than planned. Therefore acceleration is needed in this case. This final project discusses the acceleration of the duration of the project using the Crash Program method with 2 alternatives, namely the addition of working hours/overtime and the addition of labor/2 shifts, with the aim of obtaining optimal duration results in the running of a project. The result of this final project analysis is, by adding working hours, the optimal duration is 76 days with a total cost of Rp. 387,736,227,438, while through the addition of manpower/2 shifts, the optimal duration is 72 days with a total cost of Rp. 377,608.016,031.

Item Type: Thesis (Other)
Additional Information: RSKe 665.544 Hik a-1 2022
Uncontrolled Keywords: Percepatan Durasi, Crash Program, Acceleration, Crash Program
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures
T Technology > TJ Mechanical engineering and machinery > TJ930 Pipelines (General). Underwater pipelines.
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis