Pengembangan infrastruktur jalan tol di Sumatera saat ini sedang gencar dilaksanakan oleh Pemerintah, sesuai dengan Peraturan Presiden Nomor 131 Tahun 2022 tentang Perubahan Kedua atas Peraturan Presiden Nomor 100 Tahun 2014 tentang Percepatan Pembangunan Jalan Tol di Sumatera. Selaras dengan hal tersebut, Badan Usaha Jalan Tol (BUJT) selaku pengembang Jalan Tol menggunakan sistem Design and Build (DB) sebagai pendekatan untuk mempercepat dan meningkatkan efisiensi dalam pengadaan barang dan jasa. Namun, penggunaan sistem DB juga menghadapi tantangan-tantangan tertentu yang dapat menghambat kinerja proyek tersebut. Oleh karena itu, diperlukan evaluasi kinerja dan langkah-langkah perbaikan yang dapat meningkatkan efektivitas proyek berbasis DB. Penelitian ini bertujuan untuk menganalisis variabel dan indikator kinerja proyek DB dengan merujuk pada studi literatur dan melakukan wawancara dengan pihak terkait. Kinerja proyek DB dievaluasi melalui survei menggunakan kuesioner. Hasil dari pengukuran kinerja ini digunakan untuk menganalisis permasalahan-permasalahan yang dapat menghambat kinerja proyek DB melalui wawancara dan dianalisis menggunakan metode Fault Tree Analysis (FTA) serta Method for Obtaining Cut Set (MOCUS). Hasil penelitian menunjukkan bahwa sebagian besar indikator kinerja pada tahap desain lebih rendah dibandingkan dengan tahap pengadaan, tahap konstruksi, dan tahap keseluruhan proyek. Faktor ini disebabkan oleh ketidaksesuaian antara hasil survei yang dilakukan oleh Penyedia Jasa dan perubahan desain yang memengaruhi rancangan akhir. Untuk meningkatkan kinerja proyek DB, disarankan beberapa langkah perbaikan, antara lain waktu yang mencukupi dalam menyusun dokumen penawaran, pemutakhiran hasil survei dalam penyusunan dokumen penawaran teknis dan pelaksanaan proyek, melibatkan Konsultan Manajemen Konstruksi dari tahap persiapan pengadaan hingga serah terima pekerjaan dan meningkatkan koordinasi dengan stakeholder terkait.
=================================================================================================================================
The development of toll road infrastructure in Sumatra is currently being actively pursued by the Government, in accordance with Presidential Regulation Number 131 of 2022 concerning the Second Amendment to Presidential Regulation Number 100 of 2014 on the Acceleration of Toll Road Development in Sumatra. In line with this, the Toll Road Business Entity (BUJT), as the developer of the toll roads, employs the Design and Build (DB) system as an approach to expedite and enhance efficiency in the procurement of goods and services. However, the use of the DB system also faces certain challenges that may hinder the performance of the project. Therefore, it is necessary to evaluate performance and implement improvement measures to enhance the effectiveness of DB-based projects. This research aims to develop DB project performance indicators by referring to literature studies and conducting interviews with related parties. DB project performance is evaluated through surveys using questionnaires. The results of this performance measurement are used to identify problems that can hinder DB project performance through interviews and analyzed using the Fault Tree Analysis (FTA) method and Method for Obtaining Cut Set (MOCUS). The results of the study indicate that the majority of performance indicators at the design stage are rated lower compared to the procurement, construction, and overall project stages. This factor is caused by discrepancies between the survey results conducted by the Provider and design changes affecting the final design. To improve the performance of DB projects, several improvement measures are recommended, such as increasing the allocated time for preparing bid documents, improving land clearance processes, enhancing the role of surveys in the preparation of technical bid documents and project implementation, involving Construction Management Consultants from the procurement preparation stage to job handover, and coordinating with relevant stakeholders.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Design and Build, Jalan Tol, Kinerja
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: Riky Wahyu Kurniawan
Date Deposited: 08 Jul 2024 08:38
Last Modified: 08 Jul 2024 08:38
URI: http://repository.its.ac.id/id/eprint/108189

Actions (login required)

View Item View Item