Effendi, Eri Kusuma (2024) Analisa Kestabilan Transien Dan Optimalisasi Aliran Daya Dengan Penetrasi Plts Skala Besar Yang Terintegrasi Dengan PLN, PLTD, Dan Whrpg Pada Sistem Kelistrikan PT Semen Indonesia Pabrik Tuban. Masters thesis, Institut Teknologi Sepuluh Nopember Surabaya.
Text
6022201030-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2026. Download (6MB) | Request a copy |
Abstract
PT Semen Indonesia (Persero), Tbk adalah perusahaan produsen semen terbesar di Indonesia menjadi penopang pembangunan nasional sejak masa kemerdekaan hingga saat ini. Semen Indonesia Group (SIG) terdiri dari beberapa operating company yaitu Semen Gresik, Semen Padang, Semen Tonasa, Solusi Bangun Indonesia (SBI), Semen Indonesia Aceh, Semen Kupang Indonesia dan Semen Thang Long di Vietnam. SIG mempunyai pabrik yang tersebar di seluruh wilayah nusantara, salah satu pabrik terbesar adalah pabrik Tuban yang berlokasi di kota Tuban, provinsi Jawa Timur dengan kapasitas 10 juta ton/tahun. Merespon adanya krisis energi global dan program energi ramah lingkungan dengan sumber energi baru terbarukan, SIG berencana untuk membangun PLTS dengan skala besar. Kapasitas yang direncanakan adalah 25 MW. PLTS dengan radiasi sinar matahari sebagai sumber energi utama mempunyai permasalahan intermitensi dan tingkat fleksibilitas yang rendah. Pada penelitian ini akan dibahas mengenai optimalisasi aliran daya dan kestabilan transient pada system kelistrikan PLTS yang terintegrasi dengan sumber energi listrik lain yang sudah ada yaitu PLN, PLTD dan WHRPG. Dari simulasi stabilitas ini dapat dikatakan bahwa masuknya PLTS tidak mengganggu kestabilan system, lebih dari pada itu sumber energi baru terbarukan ini dapat mengurangi serapan energi pada sumber listrik utama dan dapat digunakan secara independent untuk beban non kritikal. Titik integrasi PLTS dengan main grid yang optimal adalah di Substation XII pabrik Tuban 4. Simulasi starting dan trip MV Motor berkapasitas besar yaitu 7100 kW dan 5350 kW juga dilakukan untuk mengetahui respon tegangan dan frekuensi pada line bus PLTS
======================================================================================================================================
PT Semen Indonesia (Persero), Tbk is the largest cement producer company in Indonesia and has supported national development since independence until now. Semen Indonesia Group (SIG) consists of several operating companies, namely Semen Gresik, Semen Padang, Semen Tonasa, Solusi Bangun Indonesia (SBI), Semen Indonesia Aceh, Semen Kupang Indonesia and Semen Thang Long in Vietnam. SIG has factories spread throughout the archipelago, one of the largest factories is the Tuban factory located in Tuban city, East Java province with a capacity of 10 million tons/year. Responding to the global energy crisis and environmentally friendly energy programs with new renewable energy sources, SIG plans to build PLTS on a large scale. The planned capacity is 25 MW. PLTS with solar radiation as the main energy source has intermittency problems and a low level of flexibility. In this research, we will discuss optimizing power flow and transient stability in the PLTS electrical system which is integrated with other existing electrical energy sources, namely PLN, PLTD and WHRPG. From this stability simulation it can be said that the inclusion of PLTS does not disrupt the stability of the system, more than that this new renewable energy source can reduce energy absorption in the main electricity source and can be used independently for non-critical loads. The optimal PLTS integration point with the main grid is at Substation
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | optimalisasi aliran daya, analisa kestabilan transient, sistem kelistrikan terintegrasi, PLTS; power flow optimization, transient stability analysis, integrated electrical systems, PV) |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1010 Electric power system stability. Electric filters, Passive. |
Divisions: | Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20101-(S2) Master Thesis |
Depositing User: | Eri Kusuma Effendi |
Date Deposited: | 25 Jul 2024 08:03 |
Last Modified: | 25 Jul 2024 08:03 |
URI: | http://repository.its.ac.id/id/eprint/108918 |