Fauzi, Ilham Zulfikar (2024) Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) Pada Pekerjaan Erection Girder Ramp Interchange Kraksaan Jalan Tol Probowangi Paket 1 Dengan Crawler Crane. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Text
2035201017-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2026. Download (13MB) | Request a copy |
Abstract
Pada penyusunan proyek akhir ini membahas mengenai perencanaan sistem manajemen keselamatan konstruksi (SMKK) pada pekerjaan erection girder dengan crawler crane pada overpass interchange Kraksaan, proyek jalan tol Probolinggo-Banyuwangi (Probowangi) Paket 1 yang terletak di Desa Krejengan, Kecamatan Krejengan, Kabupaten Probolinggo. Overpass ini adalah bagian dari keseluruhan proyek sepanjang 12,9 km, overpass ini dibangun sebagai penghubung jalan exit tol Kraksaan dengan jalan tol Probowangi. Overpass ini memiliki bentang total 127 m yang terbagi dalam 4 bentang antara Abutmen 1-Pier 1-Pier 2-Pier 3-Abutmen 2. Pada setiap bentangnya terdapat 9 girder yang membentang selebar 16,2 m. Erection girder pada jembatan ini menggunakan alat crawler crane yang merupakan salah satu metode paling sesuai untuk digunakan pada erection girder jembatan di atas tanah yang rata, girder bentang pendek dan tidak terlalu berat, sehingga dapat mempersingkat waktu pekerjaan jika dibandingkan dengan metode erection girder yang lain. Metode yang digunakan dalam perencanaan SMKK ini menggunakan metode identifikasi bahaya, penilaian risiko, penetapan pengendalian risiko dan peluang (IBPRP) yang mengacu pada Undang-Undang Permen PUPR No. 10 Tahun 2021 tentang Pedoman Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) dan Permen PUPR No. 8 Tahun 2023 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan Perumahan Rakyat. Hasil dari proyek akhir ini adalah pekerjaan erection girder ini terbagi menjadi 4 pekerjaan, 12 sub-pekerjaan, dan 41 bahaya yang teridentifikasi, dengan 17 bahaya berisiko rendah, 18 bahaya berisiko, 6 bahaya berisiko tinggi. Biaya penerapan SMKK sebesar Rp973.619.468 atau sebesar 1,764% dari total nilai pekerjaan overpass ramp 1.
==============================================================================================================================
In writing this final project about the planning of the construction safety management system on the erection girder work with a crawler crane on the Kraksaan interchange overpass, Probolinggo-Banyuwangi (Probowangi) toll road Package 1 project located in Krejengan Village, Krejengan District, Probolinggo Regency. This overpass is part of the entire 12.9 km project, this overpass was built as a connecting road between the Kraksaan toll exit and the Probowangi toll road. This overpass has a total span of 127 m that is divided into 4 spans between abutment 1-pier 1-pier 2-pier 3-abutment 2. In each span there are 9 girders that stretch 16.2 m wide. The erection of the girder on this bridge uses crawler crane which is one of the most suitable methods for erecting bridge girders on flat ground, short span girders and not too heavy, so it will shorten the work time when compared to other girder erection methods. The method used in the planning of this safety management system uses the hazard identification, risk assessment, determination of risk control and opportunities which refers to the Permen PUPR No. 10 Tahun 2021 concerning guidelines for construction safety management system planning and Permen PUPR No. 8 Tahun 2023 concerning guidelines for compiling cost estimates for public works and public housing construction works. The results of this final project are that the girder erection work is divided into 4 jobs, 12 sub-jobs, and 44 identified hazards, 17 low-risk hazards, 18 high-risk hazards, and 6 high-risk hazards. The cost of safety system is Rp973.619.468 or 1,764% of the total value of overpass ramp 1 works.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Sistem Manajemen Keselamatan Konstruksi (SMKK), Erection Girder, Crawler Crane, Jalan Tol, IBPRP, Construction Safety Management, HIRARC, Toll Road |
Subjects: | T Technology > T Technology (General) > T56.8 Project Management T Technology > TA Engineering (General). Civil engineering (General) T Technology > TA Engineering (General). Civil engineering (General) > TA492.G5 Girders T Technology > TE Highway engineering. Roads and pavements > TE7 TG300 Bridges--Design and construction. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Ilham Zulfikar Fauzi |
Date Deposited: | 23 Aug 2024 04:13 |
Last Modified: | 23 Aug 2024 04:13 |
URI: | http://repository.its.ac.id/id/eprint/112480 |
Actions (login required)
View Item |