Perencanaan Jaringan Distribusi Air Bersih di Kecamatan Prajurit Kulon, Kota Mojokerto

Nishimori, Yuriko Gracia (2024) Perencanaan Jaringan Distribusi Air Bersih di Kecamatan Prajurit Kulon, Kota Mojokerto. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2036201094-Undergraduate_Thesis.pdf] Text
2036201094-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (22MB) | Request a copy

Abstract

Ketersediaan air bersih merupakan aspek penting dalam memenuhi kebutuhan dasar manusia. PDAM Maja Tirta Kota Mojokerto mengambil sumber air utamanya dari Sungai Brantas yang kemudian diolah oleh IPA Wates lalu didistribusikan. Jaringan pipa eksisting dimulai dari IPA Wates hingga menuju Kecamatan Prajurit Kulon adalah sepanjang 2.300 meter, dengan debit aliran eksisting sebesar 100 liter/detik. Debit tersebut digunakan untuk mengaliri wilayah Kecamatan Magersari, Kecamatan Kranggan, dan sebagian kecil dari Kecamatan Prajurit Kulon. Kurangnya sistem perpipaan untuk mendistribusi di Kecamatan Prajurit Kulon menyebabkan aliran air tidak dapat menjangkau seluruh rumah masyarakat. Pada tahun 2035, proyeksi penduduk di Kecamatan Prajurit Kulon diperkirakan mencapai 51.542 jiwa. Proyeksi ini dilakukan menggunakan Metode Geometri, yang dianggap paling akurat karena koefisien korelasinya mendekati 1, sehingga memberikan estimasi yang lebih tepat untuk memproyeksikan jumlah penduduk di masa mendatang. Dalam perencanaan jaringan distribusi air bersih untuk tahun 2035, akan diterapkan sistem aliran melingkar pada jaringan perpipaan di Kecamatan Prajurit Kulon. Sistem ini dipilih karena dianggap lebih efisien dalam segi pengaliran akibat faktor topografi wilayah serta sistem ini mampu mendistribusikan air dengan jangkauan merata ke seluruh wilayah kecamatan. Hasil simulasi menggunakan aplikasi EPANet dan WaterGEMS menunjukkan bahwa wilayah terjauh, yaitu Kelurahan Surodinawan dan Kelurahan Blooto, masih mengalami kekurangan debit air sebesar 22.71 liter/detik secara komulatif di dua Kelurahan tersebut. Total biaya yang dibutuhkan sebesar Rp 8.994.834.926,-. Anggaran ini mencakup berbagai pekerjaan konstruksi, termasuk pekerjaan persiapan, pekerjaan tanah, pekerjaan perpipaan, pekerjaan pompa, pekerjaan pengecoran, pekerjaan pengaspalan, dan pekerjaan akhir. Rencana durasi untuk menyelesaikan seluruh pekerjaan tersebut adalah 10 pekan atau sekitar 70 hari kerja.

========================================================================================================================

The availability of clean water is essential to meet basic human needs. PDAM Maja Tirta in Mojokerto City sources its main water from the Brantas River, which is then treated at IPA Wates and distributed. The existing pipeline network runs from IPA Wates to Prajurit Kulon District, covering a distance of 2.300 meters, with an existing flow rate of 100 liters per second. This flow rate supplies Magersari District, Kranggan District, and a small part of Prajurit Kulon District. The insufficient piping system in Prajurit Kulon District prevents the water flow from reaching all households. By 2035, the population in Prajurit Kulon District is projected to reach 51.542 people. This projection is made using the Geometric Method, considered the most accurate due to its correlation coefficient being close to 1, providing a more precise estimate for future population numbers. In planning the clean water distribution network for 2035, a circular flow system will be applied to the pipeline network in Prajurit Kulon District. This system is chosen for its efficiency in terms of flow due to the area's topography and its ability to distribute water evenly across the district. Simulations using EPANet and WaterGEMS applications show that the farthest areas, Surodinawan Village and Blooto Village, still experience a cumulative water flow deficiency of 22.71 liters per second. The total cost required is Rp 8.994.834.926. This budget includes various construction works, such as preparation work, earthwork, piping work, pump work, concreting work, asphalting work, and finishing work. The planned duration to complete all these works is 10 weeks or about 70 working days.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Planning the clean water distribution network, Prajurit Kulon District, PDAM Maja Tirta, Perencanaan Jaringan Distribusi Air Bersih, Kecamatan Prajurit Kulon, PDAM Maja Tirta
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD395 Reservoirs (water supply)
T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: YURIKO GRACIA NISHIMORI
Date Deposited: 12 Aug 2024 06:35
Last Modified: 12 Aug 2024 06:36
URI: http://repository.its.ac.id/id/eprint/113082

Actions (login required)

View Item View Item