Perencanaan Bangunan Pengambilan (Intake) Pada Proyek Pembangunan Bendungan Sidan

Firdiansyah, Mohamad Arfian Fahrul Rozi (2024) Perencanaan Bangunan Pengambilan (Intake) Pada Proyek Pembangunan Bendungan Sidan. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2036201077_UNDERGRADUATE THESIS.pdf] Text
2036201077_UNDERGRADUATE THESIS.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (6MB) | Request a copy

Abstract

Provinsi Bali merupakan provinsi dengan tujuan pariwisata yang terkenal. Dengan hal tersebut laju pertumbuhan wisatawan dan pertumbuhan penduduk menjadikan kebutuhan air semakin meningkat. Peningkatan ini menjadikan ketegangan dalam hal kebutuhan air, terutama pada saat musim kemarau. Untuk itu pembuatan tambahan untuk tampungan air seperti bendungan bisa menjadi salah satu solusi. Salah satu bendungan tersebut adalah bendungan Sidan yang terletak di Kabupaten Badung. Nantinya bendungan sidan bertujuan untuk menyuplai kebutuhan air baku. Didalam bagian bendungan terdapat bagian bangunan pengambilan (intake) yang berfungsi untuk menyadap dan membagikan air sesuai kebutuhan. Metode yang dipakai untuk perencanaan ada beberapa macam metode. Seperti perhitungan proyeksi penduduk, perhitungan kebutuhan air dan analisa hidraulika untuk penentuan besar dimensi pipa bangunan pengambilan (intake). Selanjutnya, pemodelan dilakukan menggunakan perangkat lunak ETABS dengan memasukkan beban yang bekerja pada model bangunan. Hasil dari pemodelan akan dihitung berapa biaya yang diperlukan untuk perencanaan bangunan pengambilan (intake). Dari hasil analisa dan metode perencanaan bangunan pengambilan (intake) didapatkan hasil proyeksi jumlah penduduk pada tahun 2048 sebesar 1963699 jiwa dengan jumlah kebutuhan air sebesar 1.555 m3/detik dan pemakaian tertinggi dari fultuasi penggunaan air sebesar 2,30 m3/detik. Hasil dari analisa hidraulika didapatkan ukuran dimensi pipa pengambilan pada bangunan pengambilan (intake) sebesar 3,00 m. Dengan hasil pemodelan dari ETABS didapatkan hasil penulangan masing masing pada pondasi sebesar D32-80, pada dinding longitudinal D32-205 transversal D14-205, pada kolom longitudinal sebesar 8 D22 tranversal D10-150 dan D10-450, penulangan balok longitudinal sebesar 4 D20 transversal D12-100 dan D12-200. Untuk hasil dari perhitungan rencana anggaran biaya ditemukan sebesar Rp. 6.396.480.805,00-.
===================================================================================================================================
The Province of Bali is renowned as a popular tourist destination. As a result, the growth rate of tourists and the population increases the demand for water. This increase leads to tension in water needs, especially during the dry season. Therefore, constructing additional water storage facilities such as dams can be a solution. One of these dams is the Sidan Dam located in Badung Regency. The Sidan Dam aims to supply raw water needs. Within the dam, there is an intake structure that functions to collect and distribute water according to needs. Several methods are used for planning, including population projection calculations, water demand calculations, and hydraulic analysis to determine the dimensions of the intake structure's pipes. Subsequently, modeling is carried out using ETABS software by inputting the loads acting on the building model. The results from the modeling will determine the cost required for planning the intake structure. From the analysis and planning methods for the intake structure, the projected population for 2048 is estimated to be 1,963,699 people, with a water demand of 1.555 cubic meters per second, and the highest usage fluctuation being 2.30 cubic meters per second. The hydraulic analysis results show that the intake pipe dimension is 3.00 meters. The ETABS modeling results show reinforcement details for the foundation as D32-80, longitudinal wall reinforcement as D32-205 and transverse as D14-205, column longitudinal reinforcement as 8 D22 and transverse as D10-150 and D10-450, and beam longitudinal reinforcement as 4 D20 and transverse as D12-100 and D12-200. The cost estimation results amount to Rp. 6,396,480,805.00.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Bendungan Sidan, Perencanaan Intake, Kebutuhan Air, ETABS Sidan Dam, Intake Planning, Water Requirements
Subjects: A General Works > AS Academies and learned societies (General)
A General Works > AS Academies and learned societies (General)
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Mohamad Arfian Fahrul Rozi Firdiansyah
Date Deposited: 20 Aug 2024 08:13
Last Modified: 20 Aug 2024 08:15
URI: http://repository.its.ac.id/id/eprint/113497

Actions (login required)

View Item View Item