Analisis Faktor-Faktor Penyebab Keterlambatan Penyelesaian Proyek Pembangunan Transmisi SUTET 500 kV Paket 1 di PLN Unit XYZ

Irawan, Fahrul (2024) Analisis Faktor-Faktor Penyebab Keterlambatan Penyelesaian Proyek Pembangunan Transmisi SUTET 500 kV Paket 1 di PLN Unit XYZ. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032222086-Master__Thesis.pdf] Text
6032222086-Master__Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (8MB) | Request a copy

Abstract

Tujuan keberhasilan penyelesaian proyek, selain tepat kualitas dan biaya, juga diharapkan tepat waktu. PLN selaku penyedia tenaga listrik memiliki permasalahan yakni proyek SUTET 500 kV Paket 1 mengalami keterlambatan penyelesaian. Dampak keterlambatan terjadi penambahan waktu, biaya, keandalan sistem menurun, kenaikan BPP & fuel cost, arbitrase dan citra perusahaan buruk. Tujuan penelitian ini adalah untuk mengidentifikasi dan menganalisis variabel yang diduga menjadi penyebab keterlambatan proyek menurut persepsi pemilik, kontraktor dan konsultan serta merencanakan tindakan perbaikan apa saja yang dapat dilakukan untuk mengurangi bahkan menghindari terjadinya keterlambatan proyek sejenis berikutnya. Penelitian ini dimulai dari pencarian literatur terkait variabel penyebab keterlambatan proyek. Selanjutnya penyebaran kuesioner pendahuluan kepada responden ahli dan hasil evaluasinya menjadi kuesioner utama yang akan disebar ke responden penelitian. Analisis data kuesioner utama dengan menggunakan uji instrument dan metode Relative Importance Index (RII). Kuesioner akhir terkait rencana tindakan perbaikan yang dapat dilakukan untuk meminimalkan atau bahkan menghindari terjadinya keterlambatan proyek pembangunan transmisi ketenagalistrikan selanjutnya. Hasil analisis studi literatur ditemukan 47 variabel penyebab keterlambatan proyek secara umum. Dengan survei pendahuluan terjadi pengurangan variabel sehingga menjadi 29 variabel yang relevan dengan penelitian ini. Responden survei utama berjumlah 55 orang. Melalui uji instrumen dan analisis data didapatkan 7 variabel terbesar dengan 20 tindakan perbaikan sebagai mitigasi risiko. Variabel penyebab keterlambatan proyek yang sangat signifikan adalah “terkendala terkait keselamatan kerja dan/atau regulasi yang ada”, sedangkan tindakan perbaikan yang paling banyak dipilih adalah “pahami regulasi dari pihak lain yang bersinggungan”.
==================================================================================================================================
The goal of successful project completion, besides to the right quality and the right cost, is also expected to be on time. PLN as the electricity provider has a problem, the SUTET 500 kV Package 1 project has experienced a delay in completion. The impact of the delay is the addition of time, costs, decreased system reliability, increased BPP & fuel costs, arbitration and a bad company image. The purpose of this study is to identify and analyze variables that are suspected of being the cause of project delays according to the perceptions of owners, contractors and consultants and to plan what corrective actions can be taken to reduce or even avoid delays in similar projects in the future. This study began with a literature search related to variables causing project delays. Furthermore, the distribution of preliminary questionnaires to expert respondents and the results of evaluation became the main questionnaire that will be distributed to research respondents. Analysis of the main questionnaire data using instrument tests and the Relative Importance Index (RII) method. The final questionnaire is related to the corrective action plan that can be taken to minimize or even avoid delays in the next electricity transmission development project. The results of the literature study analysis found 47 variables that cause project delays in general. With the preliminary survey, there was a reduction in variables to 29 variables that were relevant to this study. The main survey respondents numbered 55 people. Through instrument testing and data analysis, 7 largest variables were obtained with 20 corrective actions as risk mitigation. The most significant variables causing project delays were "constrained by work safety and/or existing regulations", while the most frequently chosen corrective action was "understand the regulations of other parties involved".

Item Type: Thesis (Masters)
Uncontrolled Keywords: keterlambatan proyek, uji instrumen, tindakan perbaikan, transmisi ketenagalistrikan, mitigasi risiko project delays, instrument testing, relative importance index, corrective actions, electricity transmission, risk mitigation
Subjects: A General Works > AI Indexes (General)
A General Works > AI Indexes (General)
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Fahrul Irawan
Date Deposited: 17 Jan 2025 06:37
Last Modified: 17 Jan 2025 06:37
URI: http://repository.its.ac.id/id/eprint/116374

Actions (login required)

View Item View Item