Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Gedung Waron Hospital Surabaya Menggunakan Metode Half Slab

Ad'ham Virgo Wildan H, Adam (2025) Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Gedung Waron Hospital Surabaya Menggunakan Metode Half Slab. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201016-Undergraduate_Thesis.pdf] Text
2035201016-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2027.

Download (55MB) | Request a copy

Abstract

Pada penyusunan proyek akhir ini membahas tentang perhitungan waktu dan biaya pelaksanaan pembangunan Waron Hospital Surabaya. Rumah Sakit ini terletak di Jl. Kaliwaron No. 106-114, Kecamatan Gubeng Kota Surabaya, Waron Hospital ini terdiri dari 2 lantai basement dan gedung berjumlah 12 lantai dengan jumlah 99 tempat tidur. Pekerjaan yang ditinjau hanya pekerjaan struktur atas gedung rumah sakit dari lantai 1 sampai dengan lantai 11 dengan memodifikasi menjadi pelat half slab precast pada lantai 1 sampai dengan lantai 11. Struktur atas yang ditinjau meliputi balok, kolom, tangga, shearwall dan pelat overtopping yang menggunakan pengecoran cast in-situ, kecuali pelat yang menggunakan precast. Metode perbandingan yang digunakan adalah dengan menghitung biaya dan waktu struktur pelat pada bangunan dengan menggunakan half slab precast yang sebelumnya menggunakan pelat konvensional dengan teori dan ilmu dari beberapa referensi yang disebutkan dalam daftar pustaka serta dikaitkan dengan kondisi dilapangan. Dalam melakukan perhitungan rencana anggaran pelaksanaan digunakan harga dasar bahan dan harga upah pekerja di Kota Surabaya. Untuk penyusunan jadwal tiap item pekerjaan dilakukan dengan program bantu Microsoft Project. Hasil akhir dari penyusunan proyek akhir ini yaitu dapat memperoleh durasi dan biaya pelaksanaan Proyek Pembangunan Waron Hospital Surabaya, metode pelaksanaan yang digunakan, serta kurva S. Dari hasil analisis perbandingan waktu dan biaya dengan menggunakan metode half slab precast dan metode konvensional, maka didapatkan hasil dengan menggunakan metode half slab precast membutuhkan waktu pelaksanaan 144 hari kerja dan biaya pelaksanaan sebesar Rp 20.633.791.902,35. Sedangkan metode konvensional membutuhkan waktu pelaksanaan 167 hari kerja dan biaya pelaksanaan sebesar Rp 21.319.529.007,40.
====================================================================================================================================
The final project discusses the calculation of time and cost of implementing the construction of Waron Hospital Surabaya. This hospital is located at Jl. Kaliwaron No. 106-114, Gubeng District, Surabaya City, Waron Hospital consists of 2 basement floors and a 12-story building with a total of 99 beds. The work reviewed is only the work of the upper structure of the hospital building from the 1st floor to the 11th floor by modifying it into a half slab precast plate on the 1st floor to the 11th floor. The upper structure reviewed includes beams, columns, stairs, shearwalls and overtopping plates that use cast in-situ casting, except for plates that use precast. The comparison method used is to calculate the cost and time of the slab structure on the building using half slab precast which previously used conventional plates with theories and science from several references mentioned in the bibliography and associated with field conditions. In calculating the implementation budget plan, the basic price of materials and the price of workers' wages in Surabaya City are used. The preparation of the schedule for each work item is carried out using the Microsoft Project assistance program. The final result of the preparation of this final project is to obtain the duration and cost of implementing the Waron Hospital Surabaya Development Project, the implementation method used, and the S curve. From the results of the comparative analysis of time and cost using the half slab precast method and the conventional method, the results obtained using the half slab precast method require an implementation time of 144 working days and an implementation cost of Rp 20.633.791.902,35. While the conventional method requires an implementation time of 167 working days and an implementation cost of Rp 21.319.529.007,40.

Item Type: Thesis (Other)
Uncontrolled Keywords: half slab precast, conventional plate, cost, implementation time. half slab precast, pelat konvensional, biaya, waktu.
Subjects: T Technology > TH Building construction > TH11 Builders' and contractors' bulletins. Including prices, permits, etc.
T Technology > TH Building construction > TH1461 Concrete construction.
T Technology > TH Building construction > TH2521 Floors and flooring
T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH900+ Construction equipment in building construction
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Ad’ham Virgo Wildan H.
Date Deposited: 31 Jan 2025 15:02
Last Modified: 31 Jan 2025 15:02
URI: http://repository.its.ac.id/id/eprint/117415

Actions (login required)

View Item View Item