Ayuningtyas, Retnani Dita (2025) Analisis Eksergi Dan Eksergoekonomi Pada Pembangkit Listrik Tenaga Gas Dan Uap PLTGU PT PLN Nusantara Power UP Gresik. Other thesis, Institut Teknologi Sepuluh Nopember.
![]() |
Text
5009201153-Undergraduated_thesis.pdf Restricted to Repository staff only until 1 April 2027. Download (4MB) | Request a copy |
Abstract
Telah dilkakukan penilitian Tugas Akir di PLTGU Gresik PT. PLN NP UP pada tanggal 1 Februari 2024. Penelitian ini bertujuan untuk mensimulasikan PLTGU pada variasi pembebanan 50%, 100%, dan 110%, analisis eksergi dan eksergoekonomi juga dilakukan untuk mengetahui performa pada setiap komponennya. Metode yang digunakan yaitu dengan membuat pemodelan berdasarkan dengan proses diagram, kemudian setiap variasi disimulasikan. Dari hasil tersebut didapatkan nilai eksergi pada setiap state dan nilai heat flow yang digunakan untuk mengetahui kerja dari komponen. Eksergi fuel dan eksergi product didapatkan berdasarkan dengan persamaan kesetimbangan eksergi kemudian dihitung nilai eksergi destruksi pada masing-masing komponen. Nilai-nilai ekonomi dicari berdasarkan literatur sehingga faktor f dapat dihitung untuk menganalisa eksergoekonomi. Berdasarkan perhitungan dan analisis data yang dilakukan, didapatkan bahwa error dari simulasi dapat diterima. Eksergi destruksi tertinggi terletak pada komponen ruang bakar yang dipengaruhi oleh besarnya masukan dan keluaran komponen tersebut. Terdapat komponen dengan rasio kerugian atau faktor f yang mendekati nilai 0 yaitu komponen CEP. Faktor f ini dapat menjadi pertimbangan untuk melakukan maintenance karena berpengaruh pada harga listrik yang dihasilkan.
=================================================================================================================================
The final research for the thesis was conducted at the Combined Cycle Power Plant (CCPP) in Gresik, PT. PLN NP UP on February 1, 2024. This study aimed to simulate the CCPP with loading variations of 50%, 100%, and 110%. Exergy and exergoeconomic analyses were also conducted to determine the performance of each component. The method involved modeling based on the process diagram, followed by simulations for each variation. From the results, the exergy values at each state and the heat flow used to determine the work of the components were obtained. The exergy of fuel and product was calculated based on the exergy balance equations, and the exergy destruction in each component was calculated. Economic values were determined from literature, allowing for the calculation of factor f to analyze exergoeconomic. The calculations and data analysis showed that the simulation error was acceptable. The highest exergy destruction was found in the combustion chamber component, influenced by the high input and output of the component. There are components with a loss ratio or factor f close to 0, it is CEP. This factor f can be considered for maintenance as it affects the cost of electricity generated.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Eksergi, Eksergoekonomi, Siklus kombinasi, Simulasi, Exergy, Exergoeconomic, Combined cycle, Simulation. |
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Industrial Technology and Systems Engineering (INDSYS) > Physics Engineering > 30201-(S1) Undergraduate Thesis |
Depositing User: | Retnani Dita Ayuningtyas |
Date Deposited: | 03 Feb 2025 08:03 |
Last Modified: | 03 Feb 2025 08:03 |
URI: | http://repository.its.ac.id/id/eprint/118026 |
Actions (login required)
![]() |
View Item |