Evaluasi Pembagian Beban dan Relay Proteksi Pada Installasi Listrik LV-MSB Pabrik Infineon Batam-3 Fase 1.2

Sugianda, Ilfan (2025) Evaluasi Pembagian Beban dan Relay Proteksi Pada Installasi Listrik LV-MSB Pabrik Infineon Batam-3 Fase 1.2. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 8044231041-Profession_Thesis.pdf] Text
8044231041-Profession_Thesis.pdf
Restricted to Repository staff only until 1 April 2027.

Download (17MB) | Request a copy

Abstract

Keandalan sistem distribusi listrik pada sebuah pabrik sangat penting untuk meningkatkan proses produksi dan mencapai target produksi yang sudah di tetapkan manajemen sebuah Perusahaan. PT.Infineon merupakan salah satu perusahaan yang bergerak di bidang teknologi pembuatan chip dan semiconductor yang banyak digunakan pada berbagai bidang diseluruh dunia, tuntutan meningkatkan proses produksi membuat PT.Infineon mengekspansi pembagunan pabrik dengan memperbaiki gedung pabrik lama untuk di jadikan unit produksi baru memenuhi kebutuhan produksi pada tahun 2025. Untuk meningkatkan keandalan jaringan listrik diperlukan perencanaan pembagian beban serta menentukan nilai pengaturan yang tepat untuk memproteksi mesin, manusia yang bekerja di area produksi, dan juga bertujuan untuk melokalisasikan dampak padam pada area tertentu dengan merujuk pada kebutuhan mesin-mesin pada fase 1.1 dan 1.2. Pada fase ini untuk memenuhi kebutuhan produksi dan commissioning mesin, pabrik menggunakan 2 sumber listrik utama yang di suplai oleh 2 unit transformer yang berada dilokasi yang berbeda yang bertujuan untuk menunjang semua proses commiosioning mesin dan proses produksi. Berdasarkan hasil penelitian kebutuhan beban produksi pada fase ini adalah sekitar ±1558 kVA untuk gedung Main building atau sekitar 88 % dari total daya tersedia yaitu 1776 kVA dan sekitar ±1488 kVA untuk gedung bagian B atau sekitar 81 % dari total daya tersedia yaitu 1832 kVA.
==================================================================================================================================
The reliability of the electrical distribution system in a factory is crucial for improving production processes and achieving the production targets set by the company's management. PT. Infineon, a leading company in semiconductor and chip manufacturing technology widely used in various industries worldwide, is expanding its factory to meet increasing production demands. This expansion involves renovating the old factory building to serve as a new production unit to fulfill production requirements in 2025. To improve the reliability of the electrical network, load distribution planning and the determination of appropriate protection settings are necessary to safeguard machinery, ensure the safety of personnel working in production areas, and localize power outages in specific areas by referring to the needs of the machines in phases 1.1 and 1.2. At this stage, to meet production and machine commissioning needs, the factory is using two main power sources supplied by two transformers located at different sites. This setup aims to support all machine commissioning processes and production operations. Based on research findings, the estimated power demand for this phase is approximately ±1558 kVA for the Main Building, or about 88% of the total available capacity of 1776 kVA, and approximately ±1488 kVA for Building B, or about 81% of the total available capacity of 1832 kVA.

Item Type: Thesis (Other)
Uncontrolled Keywords: Daya, Transformer, Keandalan Listrik, Ekspansi pabrik, Analisa Distribusi beban, Proteksi sistem, Power, Transformer, Reliability of the electrical system , factory Expantion, Load Sharing analisis, Protection system
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays. Protective relays--Security measures.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3030 Electric power distribution systems
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 23902-Engineer Professional Program
Depositing User: Ilfan Sugianda
Date Deposited: 07 Feb 2025 01:44
Last Modified: 07 Feb 2025 01:44
URI: http://repository.its.ac.id/id/eprint/118284