Abstract

Analisis vendor komponen electrical pada sebuah proyek EPC (Engineering, Procurement, Construction) bangunan lepas pantai merupakan salah satu tahapan yang dilakukan pada tahap Detailed Engineering Design. Pada tahap pengadaan, tim engineering melakukan evaluasi terhadap vendor yang diajukan oleh tim procurement untuk menyeleksi vendor dalam proses pengadaan komponen yang akan digunakan oleh tim construction pada saat konstruksi. Pemilihan vendor merupakan salah satu keputusan penting karena dapat berdampak terhadap penyelesaian proyek, baik dari aspek kualitas maupun pemenuhan jadwal. Oleh karena itu, berbagai kriteria digunakan dalam pemilihan vendor komponen electrical yang disesuaikan dengan kebutuhan proyek agar pelaksanaannya dapat diselesaikan sesuai dengan persyaratan yang telah ditetapkan. Analisis pemilihan vendor komponen electrical dilakukan menggunakan metode pengambilan keputusan multikriteria dengan menggabungkan metode Fuzzy SWOT dan Data Envelopment Analysis (DEA) sebagai solusi yang efisien dan akurat dalam memilih vendor komponen electrical terbaik dengan mempertimbangkan aspek kualitatif dan kuantitatif berdasarkan kriteria yang telah ditentukan. Analisis dilakukan terhadap 15 vendor electrical cable yang mengajukan penawaran pada Proyek X di sebuah perusahaan EPC bangunan lepas pantai di Jakarta. Metode Fuzzy SWOT digunakan untuk mengidentifikasi dan mengevaluasi vendor berdasarkan kriteria pemilihan, sedangkan DEA digunakan untuk mengukur efisiensi relatif setiap vendor setelah melalui tahap penyaringan menggunakan analisis Fuzzy SWOT. Hasil penelitian menunjukkan bahwa vendor komponen electrical terbaik yang direkomendasikan dan dipilih adalah dua vendor yang dinyatakan efisien, yaitu PT. STD dan PT. KBL, dengan skor efisiensi sebesar 1. Pendekatan pengambilan keputusan multikriteria melalui analisis Fuzzy SWOT dan DEA dalam pemilihan vendor komponen electrical terbaik dapat digunakan oleh perusahaan untuk memberikan rekomendasi dan menentukan vendor secara objektif sehingga proses pengadaan dapat dilakukan secara efisien dan sesuai dengan kebutuhan proyek. Pendekatan ini juga dapat membantu meminimalkan potensi keterlambatan proyek serta ketidaksesuaian kualitas pada tahap konstruksi.
==================================================================================================================================
Analysis of electrical component vendors in an EPC (Engineering, Procurement, Construction) offshore structure project is one of the activities carried out during the Detailed Engineering Design stage. At the procurement stage, the engineering team evaluates vendors proposed by the procurement team to select suitable vendors for the procurement of components to be used by the construction team during the construction phase. Vendor selection is an important decision because it can affect project completion in terms of both quality and schedule compliance. Therefore, various criteria are considered in selecting electrical component vendors according to project requirements to ensure that the project is completed in accordance with the specified requirements. The selection analysis of electrical component vendors was conducted using a multi-criteria decision-making approach by combining the Fuzzy SWOT and Data Envelopment Analysis (DEA) methods as an efficient and accurate solution for selecting the best electrical component vendors while considering qualitative and quantitative aspects based on predetermined criteria. The analysis was conducted on 15 electrical cable vendors that submitted bids for Project X at an offshore structure EPC company in Jakarta. The Fuzzy SWOT method was used to identify and evaluate vendors based on the selection criteria, while DEA was employed to measure the relative efficiency of each vendor after the screening process using Fuzzy SWOT analysis. The results showed that the best electrical component vendors recommended and selected were two efficient vendors, namely PT. STD and PT. KBL, both achieving an efficiency score of 1. This multi-criteria decision-making approach, through the integration of Fuzzy SWOT and DEA analysis, can be applied by companies to provide objective recommendations and determine the most suitable electrical component vendors. Consequently, the procurement process can be carried out efficiently and in accordance with project requirements while minimizing the potential for project delays and quality nonconformities during the construction phase.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Pemilihan Vendor, Komponen Electrical, Proyek Bangunan Lepas Pantai, MCDM, Fuzzy SWOT, DEA, Vendor Selection, Electrical Component, Offshore Project, MCDM, Fuzzy SWOT, DEA.
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T58.62 Decision support systems
T Technology > TC Hydraulic engineering. Ocean engineering > TC1665 Offshore structures--Materials.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: M Iqbal Putra Azhari
Date Deposited: 02 Jul 2025 06:34
Last Modified: 26 Aug 2026 02:47
URI: http://repository.its.ac.id/id/eprint/119329

Actions (login required)

View Item View Item