Desain Pabrik Dimethyl Ether Dan Methanol Dari Natural Gas Menggunakan Metode Co-production

Indra Yafi, Hafiz Afrizal and Wahyudi, Egi (2025) Desain Pabrik Dimethyl Ether Dan Methanol Dari Natural Gas Menggunakan Metode Co-production. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5008211033_5008211078-Undergraduate_Thesis.pdf] Text
5008211033_5008211078-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (17MB) | Request a copy

Abstract

Indonesia masih sangat bergantung pada sumber daya tak terbarukan. Kebutuhan akan energi ini terus meningkat, disertai dengan lonjakan emisi gas rumah kaca. Oleh karena itu, beralih ke energi terbarukan dan alternatif menjadi krusial untuk mengurangi ketergantungan pada energi fosil. Salah satu solusi yang diusulkan adalah pemanfaatan Dimethyl Ether (DME), senyawa yang dapat digunakan sebagai bahan bakar bersih dan ramah lingkungan. Selain itu, DME memiliki beberapa keunggulan fisik dibandingkan LPG, seperti titik didih yang lebih tinggi (-24,8°C dibandingkan -42°C), yang membuatnya lebih aman dalam penyimpanan dan transportasi. DME juga tidak menghasilkan asap hitam, menjadikannya lebih ramah lingkungan. Dalam hal penanganan, DME disimpan dalam tangki bertekanan dan memerlukan sistem ventilasi yang baik serta detektor kebocoran untuk menghindari akumulasi tekanan berlebih dan risiko kebakaran. DME memiliki potensi besar sebagai bahan bakar untuk keperluan rumah tangga, dengan emisi polutan yang jauh lebih rendah dibandingkan LPG. Pemanfaatan gas alam untuk DME diharapkan dapat membantu memenuhi kebutuhan energi nasional dan mengurangi ketergantungan pada impor LPG. Tidak hanya itu, pabrik ini nantinya akan memproduksi metanol sebagai product. Pabrik DME-Metanol ini akan beroperasi pada awal tahun 2028 dengan pembelian alat-alat pabrik pada tahun 2025 dan masa konstruksi selama dua tahun dari awal tahun 2026 sampai akhir tahun 2027. Pabrik DME-Metanol ini akan didirikan di daerah Kawasan Industri Aceh-Ladong yang berlokasi di Kota Gampong Ladong. Pemilihan lokasi ini didasarkan pada parameter-parameter, seperti ketersediaan lahan dan bahan baku, lokasi pemasaran, sumber utilitas (energi listrik dan air), sumber tenaga kerja, aksesibilitas dan fasilitas transportasi, hukum dan peraturan daerah, serta iklim dan topografi. Bahan utama yang digunakan dalam produksi DME-Metanol adalah gas alam. Pabrik DME- Metanol ini memiliki kapasitas produksi sebesar 636.634,95 ton/tahun dengan rincian produksi DME sebesar 127.509 ton/tahun dan produksi Metanol sebesar 509.125,95 ton/tahun. Perencanaan ini berdasarkan rencana pemerintah, jumlah produksi, konsumsi, ekspor, dan impor LPG serta kapasitas pabrik yang sudah berdiri (existing capacity) yang diproyeksikan pada tahun 2030. Pabrik DME-Metanol ini akan beroperasi secara 24 jam per hari selama 330 hari dalam 1 tahun. Untuk memproduksi DME dan Metanol tersebut, diperlukan bahan baku gas alam sebesar 1.071.428,62 ton/tahun. Tahapan dalam proses pembuatan DME dan Metanol dibagi menjadi lima bagian unit, yaitu unit proses reforming. Unit kedua, yaitu methanol synthesis dan dilanjutkan unit ketiga, yaitu methanol purification. Lalu, Unit keempat adalah DME synthesis, dan unit kelima adalah DME purification.
====================================================================================================================================
Indonesia remains heavily dependent on non-renewable resources. The need for this energy continues to increase, accompanied by a surge in greenhouse gas emissions. Therefore, switching to renewable and alternative energy is crucial to reduce dependence on fossil fuels. One proposed solution is the use of Dimethyl Ether (DME), a compound that can be used as a clean and environmentally friendly fuel. Furthermore, DME has several physical advantages over LPG, such as a higher boiling point (-24.8°C compared to -42°C), which makes it safer for storage and transportation. DME also does not produce black smoke, making it more environmentally friendly. In terms of handling, DME is stored in pressurized tanks and requires a good ventilation system and leak detectors to prevent excess pressure buildup and the risk of fire. DME has great potential as a fuel for household use, with much lower pollutant emissions than LPG. The use of natural gas for DME is expected to help meet national energy needs and reduce dependence on LPG imports. Furthermore, this plant will eventually produce methanol as a byproduct. The DME-Methanol plant will be operational in early 2028 with the purchase of factory equipment in 2025 and a two-year construction period from early 2026 to the end of 2027. The DME-Methanol plant will be established in the Aceh-Ladong Industrial Estate located in Gampong Ladong City. The location selection is based on parameters such as land and raw material availability, marketing location, utility sources (electricity and water), labor sources, transportation accessibility and facilities, local laws and regulations, and climate and topography. The main material used in the production of DME-Methanol is natural gas. The DME-Methanol plant has a production capacity of 636,634.95 tons/year with a breakdown of DME production of 127,509 tons/year and Methanol production of 509,125.95 tons/year. This planning is based on government plans, the amount of LPG production, consumption, exports, and imports as well as the existing capacity of the plant projected for 2030. The DME-Methanol plant will operate 24 hours a day for 330 days a year. To produce DME and Methanol, natural gas raw materials of 1,071,428.62 tons/year are required. The stages in the DME and Methanol manufacturing process are divided into five units, namely the reforming process unit. The second unit is methanol synthesis and continued with the third unit, namely methanol purification. Then, the fourth unit is DME synthesis, and the fifth unit is DME purification

Item Type: Thesis (Other)
Uncontrolled Keywords: Co-Production, Dimetil Eter, Metanol, Pabrik DME-Metanol, Gas Alam, Co-Production, Dimethyl Ether, DME-Metanol Plant, Methanol, Natural Gas
Subjects: T Technology > TP Chemical technology > TP155.5 Chemical plants--Design and construction
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Chemical Engineering > 24201-(S1) Undergraduate Thesis
Depositing User: Egi Wahyudi
Date Deposited: 23 Jul 2025 06:40
Last Modified: 23 Jul 2025 06:40
URI: http://repository.its.ac.id/id/eprint/120831

Actions (login required)

View Item View Item