Sanyoto, Agung Toni (2007) Analisa Keandalan Kuantitatif Boiler Water Tube Dan Laju Deposit Di Permukaan Luar Superheater Low Temperatur Outlet Pendant Pada Boiler Tubing System (Studi Kasus Di PT. Ipmomi PLTU Paiton Unit 7&8 Probolinggo). Other thesis, Institut Teknologi Sepuluh Nopember.
![]() |
Text
2199100027-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (85MB) | Request a copy |
Abstract
PT. IPMOMI menpakan perusahaan yang mengoperasikan proses produksi listrik di PLTU unit 7 dan 8 Paiton Probolinggo. Boiler dan proses pembakaran batubara didalamnya merupakan salah satu bagian proses produksi listrik yang pelu diperhatikan di power plant. Proses tersebut menghasilkan sisa pembakaran atau biasa disebut deposit yang berpengaruh pada effisiensi boiler serta komponen subsistem didalamnya seperti boiler tubing system. Didalam boiler terdapat ribuan tube yang perlu dijaga kondisinya baik permukaan luar maupun dalam agar transfer panas dalam boiler berjalan dengan baik. Sebuah strategi perencanaan perawatan sangat dibutuhkan oleh perusahaan untuk menjawab tantangan manajemen perawatan modem yang menghasilkan perusahaan menekan biaya - biaya yang inefisien. Strategi perencanaan perawatan yang baik harus mampu menentukan biaya optimum dari perawatan sehingga dapat mengefisienkan biaya serta mampu meningkatkan produksi dari perusahaan. Perawatan preventive maintenance dengan bermacammacam interval waktu tertentu akan menunjukkan reliabilitas yang berbeda-beda dari tiap-tiap boiler dan terbukti bisa memperpanjang umur dari boiler itu sendiri. Disamping itu dengan jadwal pembersihan deposit dari permukaan tube yang sesuai bisa juga menghemat biaya yang dikeluarkan seminimal mungkin
=====================================================================================================================================
PT. IPMOMI operates the electricity production process at Paiton Probolinggo Power Plant Units 7 and 8. Boilers and the coal combustion process within them are crucial components of the electricity production process at power plants. This process produces combustion residue, also known as deposits, which impact the efficiency of the boiler and its subsystem components, such as the boiler tubing system. Thousands of tubes within the boiler require maintenance, both internally and externally, to ensure proper heat transfer. A maintenance planning strategy is essential for companies to address the challenges of modern maintenance management, which can help reduce inefficient costs. A sound maintenance planning strategy must be able to determine the optimum maintenance cost, thereby streamlining costs and increasing production. Preventive maintenance at various intervals will demonstrate varying levels of reliability for each boiler and has been proven to extend the life of the boiler. In addition, with a suitable schedule for cleaning deposits from the tube surface, you can also save costs to a minimum
Item Type: | Thesis (Other) |
---|---|
Additional Information: | RSM 620.004 52 San a-1 2007 (weeding) |
Uncontrolled Keywords: | keandalan, boiler tubing system, loju deposit, biaya dan wakbl optilllllm; reliability, boiler tubing system, deposit rate, cost and time optimum |
Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ263.5 Boilers (general) |
Divisions: | Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis |
Depositing User: | EKO BUDI RAHARJO |
Date Deposited: | 17 Oct 2025 07:10 |
Last Modified: | 17 Oct 2025 07:10 |
URI: | http://repository.its.ac.id/id/eprint/128615 |
Actions (login required)
![]() |
View Item |