Studi Perencanaan Sistem Ventilasi dan Pengkondisian Udara (HVAC) pada Ruangan Akomodasi Kapal Perang Jenis Korvet Ukuran 90 meter

Prasadhana, Adityaksa (2010) Studi Perencanaan Sistem Ventilasi dan Pengkondisian Udara (HVAC) pada Ruangan Akomodasi Kapal Perang Jenis Korvet Ukuran 90 meter. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4204100041-Undergraduate_Thesis.pdf] Text
4204100041-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (94MB) | Request a copy

Abstract

Perancangan sistem HVAC di dalam Kapal Perang jenis Korvet dilakukan untuk menyediakan ketersediaan kebutuhan udara dan pengkondisian udara di dalam (baik dalam suhu maupun kelembaban),Hal ini bertujuan untuk menjaga kenyamanan thermal untuk personel yang ada di dalam kapal, serta menjaga keamanan beberapa peralatan elektronik dari adanya suhu temperature yang tinggi. Di dalam menyediakan system HVAC yang cocok, maka akan dipilih pengkondisian udara dengan Chilled Water Plant. Hal ini dilakukan dengan mempertimbangkan efektifitas di dalam mengkondisikan udara. Beberapa komponen yang dibutuhkan adalah Chilled Water Unit, Air Handling Unit, Fan / Blower, dan AC Split System. Pada perencanaan, akan ditentukan besarnya masing masing ruangan yaitu; 22 oc untuk ruangan AC, 16 oc untuk ruangan AC suhu rendah, serta 27 °C untuk ruangan tanpa menggunakan AC. Pada studi perencanaan ini, maka akan didapatkan data besarnya beban pendinginan yang dibutuhkan untuk mengkondisikan udara di ruangan akomodasi yaitu sebesar 558.775,5 Btu/hr atau 163,62 kW (untuk ruangan AC) dan 235.888,34 Btu/h atau 69,07 kW (untuk ruangan non AC)
====================================================================================================================================
The design of the HVAC system in the Corvette Warship is carried out to provide the availability of air needs and air conditioning inside (both in temperature and humidity), This aims to maintain thermal comfort for personnel on board, as well as maintain the safety of some electronic equipment from high temperatures. In providing a suitable HVAC system, air conditioning with a Chilled Water Plant will be selected. This is done by considering the effectiveness in conditioning the air. Some of the components needed are the Chilled Water Unit, Air Handling Unit, Fan / Blower, and AC Split System. In the planning, the size of each room will be determined, namely; 22 oc for the AC room, 16 oc for the low temperature AC room, and 27 °C for the room without using AC. In this planning study, the cooling load required to condition the air in accommodation rooms will be 558,775.5 Btu/hr or 163.62 kW (for air-conditioned rooms) and 235,888.34 Btu/h or 69.07 kW (for non-air-conditioned rooms)

Item Type: Thesis (Other)
Additional Information: RSSP 623.857 Pra s-1 2010 (weeding)
Uncontrolled Keywords: Korvet, HVAC,Chilled Water Plant, Beban Pendinginan, Ruangan Akomodasi; Corvette, HVAC, Chilled Water Plant, Cooling Load, Accommodation Space
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM485 Cold storage on ships. Marine refrigeration.
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 18 Dec 2025 07:40
Last Modified: 18 Dec 2025 07:40
URI: http://repository.its.ac.id/id/eprint/129059