Satya, I Made Raihan Mutki (2022) Analisis Perbandingan Pada Pekerjaan Box Girder Proyek Pembangunan Faslitas Perkeretaapian Untuk Manggarai S/D Jatinegara (Paket A) (Tahap II). Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
03111840000015-Undregraduate_thesis.pdf Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
Metode Konstruksi pada pengerjaan suatu proyek merupakan salah satu faktor yang dapat menentukan waktu dan biaya yang akan dikeluarkan dalam suatu proyek. Pekerjaan Box Girder eksisting pada proyek pembangunan fasilitas perkeretaapian untuk Manggarai sampai dengan Jatinegara menggunakan metode cast-in situ. Pada metode cast in situ ini atau biasa dikenal dengan metode konvensional dimana pengerjaan beton precast dilakukan di site dan menggunakan perancah untuk menahan beksiting agar sesuai elevasi rencana. Kemudian, dilakukan pemasangan bekisting, pembesian, pengecoran, dan stressing pada box girder. Pada penelitian ini, metode eksisting, akan dibandingkan dengan metode precast.. pembuatan box girder dilaksanakan pada pabrik atau diluar site kemudian box girder dikirim menuju proyek, setelah itu dilakukan erection menggunakan launcher gantry. Pada tugas akhir ini metode eksisting akan dimodifikasi ke precast, lalu dibandingkan keduanya. Perbandingan dari biaya dan waktu pada dua metode tersebut akan dilakukan dengan cara menghitung biaya dan waktu dari proses pengerjaan dua metode yang ada dengan meninjau RAB (rancangan Anggaran Biaya) yang meliputi kebutuhan material,alat berat, dan tenaga kerja. Sedangkan, untuk perbandingan waktu dilihat dari penjadwalan pelaksanaan pekerjaan box girder. Kemudian dari perhitungan biaya dan waktu tersebut dilakukan analisis perbandingan biaya dan waktu dari dua metode tersebut. Hasil yang didapatkan untuk pekerjaan box girder dengan metode cast in situ membutuhkan total biaya sebesar Rp 50.268.255.454 untuk 17 span box girder dan memakan waktu selama 33 hari untuk menyelesaikan satu span, sedangkan untuk metode precast menggunakan launcher gantry membuthkan total biaya Rp39.010.174.297 dan memakan waktu selama 10 hari kerja. Maka metode yang paling opimum adalah box girder dengan metode precast menggunakan launcher gantry.
===================================================================================================================================
Project Construction method is one of the factors that can determine project time and costs. Box Girder on the railway facility construction project for Manggarai to Jatinegara is installed using the cast-in situ method. In this cast in situ method or commonly known as the conventional method where precast concrete work is carried out on site and uses scaffolding to hold the formwork to match the design elevation. Then, the installation of formwork, iron, casting, and stressing on the box girder is carried out. In this study, the method wass compared to the precast method the box girder is carried out at the factory or outside the site, which then brought to the project site to beerected using a gantry launcher. In this final project, the existing method will be modified to precast, then these two methods will be compared to each other. The project time and cost comparison has been conducted by calculating the project cost RAB (designated Budget) which includes material, heavy equipment, and labor requirements and the scheduling of the implementation of the box girder work. The results obtained for box girder work using the cast in situ method require a total cost of Rp.50,268,255,454 for 17 span box girders and 33 days to complete one span, while the precast method using a gantry launcher requires a total cost of Rp39.010.174.297 and took 10 working days. Therefore, the most opimum method is box girder with precast method using gantry launcher.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Biaya, Waktu, Box Girder, Prec, Cost,Time, Box Girder, Precast. |
| Subjects: | T Technology > TH Building construction > TH437 Building--Cost control. |
| Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 08 Jan 2026 04:19 |
| Last Modified: | 08 Jan 2026 04:19 |
| URI: | http://repository.its.ac.id/id/eprint/129362 |
Actions (login required)
![]() |
View Item |